Installing and Cabling Flexi Zone Micro High Power
2x20 W BTS
g
Issue: 02
Note: Before tightening the screws make sure that:
the static mounting bracket is securely captivated in the slot in the interface bracket.
•
tabs on the interface bracket are captivated by the back surface of the static
•
mounting bracket.
Figure 18
Correct bracket alignment
Tabson
interfacebracket
Figure 19
Installing the BTS on a vertical pole
DN09229011
Installing Flexi Zone Micro BTS
Tabon
staticbracket
Slotininterfacebracket
23