Electrical Connections: General On single-phase pumps, the The contractor must conform white, black and red pump Information to the latest requirements of the leads must be connected to the National Electrical Code. All pump terminal blocks in the Attention: conduit and cables shall have panel exactly as shown on panel This manual contains important conduit per NEC Code NFPA...
Page 3
Check full load current with on pump start and the action Panel amprobe and compare it with must show no lazy movement. Troubleshooting the nameplate rating. (Clamp For further details, consult amprobe around one phase.) the factory. 1. Pump does not run in With pump running, check Check junction boxes for Hand position.
Page 4
one at a time and check e. Dry out the junction box operation with an ohmmeter (if furnished); moisture in by manually raising and the junction box will tend lowering the float. to cause the intrinsically safe relays to energize 3.
Pentair Hydromatic will cover only the lower seal and labor thereof for all dual seal pumps. under no circumstance will Pentair Hydromatic be responsible for the cost of field labor, travel expenses, rented equipment, removal/reinstallation costs or freight expenses to and from the factory or an authorized Pentair Hydromatic service facility.