Download Print this page

SAMSGAZEBOS 10-OCT-A-CUPOLA Assembly Instructions Manual

10' octagon gazebo single-tiered roof for an uneven patio

Advertisement

Quick Links

S
AMS
10' Octagon Gazebo #A single- ered roof for an uneven pa o
Assembly Instruc ons
-
10-OCT-A-CUPOLA
G
AZEBOS
S
G
AMS
AZEBOS.COM, INC.
132 E. 163rd Street, Gardena, CA 90248
Customer Service: (800) 376-7267
Monday ~ Friday: 8:00~ 6:00, Saturday: 10:00 ~ 4:00 (Pacific Standard Time)
TM
info@samsgazebos.com
1
10-OCT-A

Advertisement

loading

Summary of Contents for SAMSGAZEBOS 10-OCT-A-CUPOLA

  • Page 1 AZEBOS 10’ Octagon Gazebo #A single- ered roof for an uneven pa o Assembly Instruc ons 10-OCT-A 10-OCT-A-CUPOLA AZEBOS.COM, INC. 132 E. 163rd Street, Gardena, CA 90248 Customer Service: (800) 376-7267 info@samsgazebos.com Monday ~ Friday: 8:00~ 6:00, Saturday: 10:00 ~ 4:00 (Pacific Standard Time)
  • Page 2: Before Assembly

    five hours by two people. If you have a level floor such as wood deck, e-mail us at info@samsgazebos.com at the me of order; we can make all posts same complete with hardware necessary at no extra charge.
  • Page 3 10’ Octagon Gazebo #A single- ered roof List of Parts Longer Post Standard Post This is line 1, standard post length. 8 Headers 8 Posts: 1 standard and 7 longer 8 Ra ers 8 Post Bases (One is a ached to the standard post.) 8 Lower Roof Panels 8 Upper Roof Panels...
  • Page 4 Top Rail Rail 16 Corbels 5 Rails & 5 Top Rails 2 Temporary Rail Holders 2 Wood Pieces, 1 small and 1 large, & 1 small 4x4 for leveling 8 Temporary Post Holders 8 3/8”Hanger Bolts with Washers & Nuts...
  • Page 5 8 “L” Post Connectors 8 3/8” Wedge Anchors 8 3/8” Lag Bolts & Washers 8 Header Connectors Screws : 16 Small for the bo om Nails : 32 Small for the header of the lower roof panels & Large connectors & Large for every- for everywhere else where else 1 Cupola (op onal):...
  • Page 6 This is a template for post posi ons. Rotate it to face your house or pathway. Front Entrance 1. Sweep the area where the gazebo will be installed; it is easy 2. Lay out the eight headers in an octagon shape. The gazebo to work on a pa o without any debris.
  • Page 7 7. Trace both the inside and the outside of the headers with a pen- 8. Repeat step 7 for the other seven headers. cil. The lines will determine the permanent posi on of the gazebo. Taping your level to the longer piece is recommended.
  • Page 8 IMPORTANT: This corner marked at top is the lowest so that a post will be longest. This corner is the highest and the standard post 1 will be installed. 13. The lines indicate the height differences of the eight corners. 14.
  • Page 9 Post Line 1 The other posts should be LONGER than the line 1, the standard post 1. 19. Lay the small leveling wood piece and a post together and 20. Extend the line 2 around the perimeter to the other sides of align “line 1”.
  • Page 10 25. Label the post, headers, and the corners “2”. Labeling 26. Go to the next corner and repeat steps 17 ~ 24 for posts them is the best way to avoid confusion. 3 ~ 8, and label each post in the sequen al numerical order. Your lines may look different depending on a...
  • Page 11 31. Remove the temporary nails and screws from the headers 32. Sweep the dust away from drilling the holes. and move the headers outwards. 33. Drill 1-1/2” deep where you previously drilled in step 29. 34. Sweep the dust away again. The line should be directly over the drilled holes.
  • Page 12 Outside 37. Start installing the posts. It is crucial that you install the 38. Let the bolt of the post base slip into the hole. right posts to the correct labeled corner. Inside Outside 40. Temporarily a ach an “L” post connector to the post and 39.
  • Page 13: Socket Wrench

    Socket Wrench 43. Fasten the L post connector to the post with a lag bolt. 44. Insert a wedge anchor into the newly drilled hole and hammer it in. Temporary Post Holder 46. Go to the next post and repeat steps 38 ~ 45. Put a tem- 45.
  • Page 14 Post Rail Outside 49. Hold up the rail with temporary rail holders from the 50. Push the rail to the post from the outside towards the outside of the base as posts. inside of the fi ng. Outside Outside 51. Fasten the rail to the post with a large screw as shown above. 52.
  • Page 15 Outside 55. Temporarily fasten these headers with large nails to pre- 56. Now fasten the headers with a large screw. vent shi ing while you fasten the headers with screws. Inside 57. Fasten down the headers with the washers and nuts. 58.
  • Page 16 61. Hammer the ra er down into the fi ng. 62. Fasten the ra er from both sides with large screws. Ra ers 63. Install ra ers one a er another. Adjust the ra er top 64. As you do this, fasten the ra er tops with large nails. Coun- posi ons up or down as you install ra ers.
  • Page 17: Interior View

    Top View Interior View 67. Upon complete installa on of the ra ers, they should 68. Fasten the ra er tops to each other with large screws. form a perfect octagon as seen above . 69. Now install the lower roof panels one at a me. 70.
  • Page 18 The heavier look- ing sides should be at the bo om. 73. Fasten the upper roof panels and the lower roof panels to 74. Now install the corbels with large screws. Remove the the ra ers with nails. temporary nails from the headers from step 55. 75.

This manual is also suitable for:

10-oct-a