Installing The Switch; Package Contents; Installation Overview; Mounting The Switch In A 19-Inch Rack - ADTRAN NetVanta 1560-24 Quick Start Manual

24-port managed gbe switch
Table of Contents

Advertisement

Installing the Switch

g
NOTE
Refer to the national, state and local electrical codes for the requirements for power, grounding, wiring, and installation methods.

Package Contents

■ NetVanta 1560-24 switch
■ AC power cord
■ DB-9 to RJ-45 cable
■ Micro-USB to USB cable
■ Four adhesive rubber feet
■ Mounting kit for rack mount (two brackets and eight screws)
■ Quick Start
f
CAUTION!
The NetVanta 1560-24 is intended for indoor use only. Ethernet, PoE cables and attached equipment are intended for use within the same
building with equipotential bonding, and not intended to be placed in separate buildings or structures. Failure to deploy as described could
result in permanent damage from lightning or other electrical events and voids the warranty.
f
WARNING!
This equipment is not suitable for use in locations where children are likely to be present.

Installation Overview

To install the switch, you will need to do the following:
1. Mount the switch
2. Connect AC Power
3. Install SFP+ Modules

Mounting the Switch in a 19-inch Rack

To mount the switch into a 19-inch rack, complete the following steps.
1. Attach the brackets provided in the mounting kit to both sides of the chassis. Insert the provided screws and tighten them with a screwdriver to
secure the brackets.
2. Position the chassis in the stationary equipment rack. Allow 1-inch of clearance between units.
2
Figure 3. Attaching Brackets to the Switch
617101564F1-13A

Advertisement

Table of Contents
loading

This manual is also suitable for:

17101564f1

Table of Contents