Operation and Maintenance Manual
Ice Bank
Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of
heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training.
Improperly installed, adjusted or altered equipment by an unqualified person could result in death or serious injury.
When working on the equipment, observe all precautions in the literature and on the tags, stickers, and labels that are
attached to the equipment.
August 2020
®
Energy Storage
SAFETY WARNING
IB-SVX147D-EN

Advertisement

loading

Summary of Contents for Trane Ice Bank

  • Page 1 Operation and Maintenance Manual ® Ice Bank Energy Storage SAFETY WARNING Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training.
  • Page 2: Warnings, Cautions, And Notices

    (Global Harmonized System of Classification and compounds have the same potential impact to the Labeling of Chemicals) guidelines for information on environment. Trane advocates the responsible handling of allowable personal exposure levels, proper all refrigerants-including industry replacements for CFCs respiratory protection and handling instructions.
  • Page 3: Revision History

    Copyright This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
  • Page 4 Therefore, we have The Ice Bank tank is a modular, insulated polyethylene tank started this manual with a brief overview of the technol- containing a spiral-wound plastic tube heat exchanger ogy and its application.
  • Page 5: Maintenance

    (6.7ºC), by permitting sufficient 52F (11.1C) fluid to 12ºF (-11.1ºC) (25%EG/H O); however, some jobs require ® bypass the Ice bank tank and mix with the 34F (1.1C) lower freeze points because of particular operating fluid, to achieve the desired 44F (6.7C) temperature. The conditions.
  • Page 6: Warranty Repairs

    Shut-off Ice Cap Date tube w/no ice Freeze Temp. Mfr. (Biocide) Temperature Present For example 1/4 inch (6mm) 12°F (-11.1°C) 28°F (-2.2 °C) ® Note: To find out more about Ice Bank energy storage visit calmac.com or trane.com/energy storage. IB-SVX147D-EN...
  • Page 8 For more information, please visit trane.com or tranetechnologies.com. Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.