Installation Clearance And Position Requirements; Obtaining The Esn; Installation Procedure; Installing The Vibration Isolators And Dampers - Huawei BTS3900 GSM Installation Manual

Hide thumbs Also See for BTS3900 GSM:
Table of Contents

Advertisement

BTS3900 GSM
Installation Guide
Compared with issue 06 (2010-01-30), no information is deleted.
06 (2010-01-30)
This is the fifth commercial release.
Compared with issue 05 (2009-12-30), this issue is added with the following topic:
l
Compared with issue 05 (2009-12-30), this issue incorporates the following change:
Content
9.1 Installing the Base on the Concrete
Floor
9.2 Installing the Base on the ESD Floor
Compared with issue 05 (2009-12-30), no information is deleted.
05 (2009-12-30)
This is the fourth commercial release.
Compared with issue 04 (2009-09-30), no topic is added.
Compared with issue 04 (2009-09-30), this issue incorporates the following change:
Content
3.4 Installation Clearance and Position
Requirements

6 Installation Procedure

8 Installing the Vibration Isolators and
Dampers
10.1 Installing the Vehicle-mounted
Cabinet
Compared with issue 04 (2009-09-30), no topic is deleted.
04 (2009-09-30)
This is the third commercial release.
Compared with issue 03 (2009-07-15), no information is added.
Compared with issue 03 (2009-07-15), there are some editorial changes.
Compared with issue 03 (2009-07-15), no information is deleted.
Issue 13 (2010-10-30)

5 Obtaining the ESN

Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
1 Changes in the BTS3900 GSM Installation Guide
Change Description
The base is changed.
Change Description
The description of vehicle-mounted cabinet
is added.
1-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

V300r008V300r009V100r012

Table of Contents