General Information - Fiadmpr102; Inspection; Parts List - Trane Precedent FIADMPR102 Series Installation Instructions Manual

Table of Contents

Advertisement

General Information – FIADMPR102*
This instruction covers installation of FIADMPR102* for 6
to 12.5 tons, T/YS*072-150.

Inspection

1. Unpack all components of the kit.
2. Check carefully for shipping damage. If any damage is
found, report it immediately, and file a claim against
the transportation company.
3. Visually inspect the components for shipping damage
as soon as possible after delivery, before it is stored.
Concealed damage must be reported within 15 days.
4. If concealed damage is discovered, stop unpacking the
shipment.
5. Do not remove damaged material from the receiving
location. Take photos of the damage, if possible. The
owner must provide reasonable evidence that the
damage did not occur after delivery.
6. Notify the carrier's terminal of damage immediately by
phone and by mail. Request an immediate joint
inspection of the damage by the carrier and the
consignee.
Note: Do not attempt to repair any damaged parts until
the parts are inspected by the carrier's
representative.

Parts List

One (1) Motorized OA Damper Assembly
12 Screws
One (1) Blockoff; Bottom
One (1) Actuator Control Harness
ACC-SVN231A-EN
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Precedent fiadmpr103 series

Table of Contents