Navantia AVANTE 2200 Manual

Fan coils

Advertisement

Quick Links

PROJECT:
SHIPYARD:
SYSTEM:
REV
DESCRIPTION
0
For information / and comments
For information / and comments.
A
Item list included
B
Updated
C
Updated
· P
:
AVANTE 2200
ROJECT
· S
: NAVANTIA S.A.
HIPYARD
· S
:
HVAC
YSTEM
AVANTE 2200
HVAC
FAN COILS
REF.: D-MO5462-001
DATE
03/03/2017
18/07/2017
10/08/2018
30/07/2019
1
ISSUED
CHECKED
BY
BY
ALR
AMF
ALR
AMF
JMC
AMF
JMC
AMF
D-MO5462-001_RevC
APPROVED
BY
MRH
MRH
MRH
MRH

Advertisement

Table of Contents
loading

Summary of Contents for Navantia AVANTE 2200

  • Page 1 · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM PROJECT: AVANTE 2200 SHIPYARD: SYSTEM: HVAC FAN COILS REF.: D-MO5462-001 ISSUED CHECKED APPROVED DESCRIPTION DATE For information / and comments 03/03/2017 For information / and comments.
  • Page 2 · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM SAFETY WARNING Before carrying out any operation on the machine, please read this installation and operation manual carefully. Installation and maintenance must be carried out only by qualified...
  • Page 3: Table Of Contents

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM TABLE OF CONTENTS 1. PARTS OF BASIC UNIT ..................4 TRANSPORT AND HOISTING ................5 2.1 S ......................5 AFETY PRESCRIPTIONS 2.2 S ......................5 COPE OF DELIVERY 2.3 P...
  • Page 4: Parts Of Basic Unit

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 1. PARTS OF BASIC UNIT Various unit parts are described in detail below. CASING The structure of the fan-coil will be both resistant and lightweight, will be suitably thermal and acoustic insulated and a special attention will be paid to an easy drain and correct insulation of the drain tray.
  • Page 5: Transport And Hoisting

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM TRANSPORT AND HOISTING 2.1 Safety prescriptions In this section, general safety prescriptions are indicated for carrying out transport operations of the equipment. Other safety prescriptions are indicated in different sections of this document.
  • Page 6: Preservation Method

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM with sufficient carrying capacity.  Secure the load during transit to prevent it from tipping or falling 2.5 Preservation method When storing the unit for a temporary period, the following points must be noted: ...
  • Page 7: Unit Installation

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM Observe the following points:  Only install the unit in enclosed spaces.  Mounting systems must be capable of bearing the weight of the unit, including any accessories.
  • Page 8: Connecting The Condensate Drain

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 3.4 Connecting the condensate drain In order for the condensate to be drained off properly, the condensate drain by others must be connected to the drip pan.
  • Page 9: Safety Inspection

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 4.1 Safety inspection Before commissioning, ensure that the following conditions are true:  The entire system of which this unit is part has been installed both mechanically and electrically.
  • Page 10: Troubleshooting

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 5. TROUBLESHOOTING Deviations from normal operating states of the fan coil units are evidence of malfunctions and must be investigated by maintenance personnel. The following table should serve as a starting point for maintenance personnel...
  • Page 11: Maintenance

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 6. MAINTENANCE The unit is a high-quality and reliable unit. However, to guarantee the permanent functioning and performance of the unit, regular maintenance and inspection by technical experts is necessary.
  • Page 12: Quarterly Maintenance

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 6.1.1 Quarterly maintenance 6.1.1.1 Check noise and vibration Conditioned Based Maintenance (CBM) will be taken into account for the Fan Coil Units. Therefore, there will be sensors installed in the units for any unusual noise or vibration emanating from the unit.
  • Page 13: Corrective Maintenance

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM  Visually inspect the quality of the belt.  Visually inspect the pulley surfaces for any damages, cleanliness and free of grease  Remove dirt from the interior of the casing by vacuuming.
  • Page 14: Replacing Motor

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 6.2.5 Replacing motor  Remove the V-belts.  Remove the pulley.  Unbolts the four mounting bolts.  Replace the faulty motor with the new one.
  • Page 15: Particular Events

    · P AVANTE 2200 ROJECT · S : NAVANTIA S.A. HIPYARD · S HVAC YSTEM 7.5 Particular events Faults, accidents, deviations of normal management and other particular events should be recorded in the equipment maintenance data record sheet. D-MO5462-001_RevC...

This manual is also suitable for:

D-mo5462-001

Table of Contents