Preparation Of Cabinet For Operation; Removing Cabinet From Skid; Door Installation (Sn Models); Operation - Hussmann SM Operation Manual

Dual temperature merchandisers
Table of Contents

Advertisement

Removing Cabinet From Skid

Move the Spot Merchandiser as close
as possible to its permanent location
and remove hold-down brackets at the
front and rear of the cabinet. Check
refrigeration lines to see that they are
"free" and no damage has occurred
during shipping . Check fan blades for
free operation.
Door Installation ( SN Models)
After the merchandiser has been placed
to its final position, the doors may be
installed. The doors must be positioned
inside of each guide to have a good
seal.

Operation

Always allow the cabinet to warm up to
65° F before starting the unit. If the
cabinet has just been delivered from a
cold ambient, such as winter, wait least
16 hours before starting.
R

PREPARATION OF CABINET FOR OPERATION

Should the unit be disconnected when
running, wait 5 minutes before restarting.
This allows the refrigerant pressures to
equalize and prevents the compressor
from cycling on its overload protector.
It is advisable to run the unit for 30 to 60
minutes before loading with merchandise.
This is to allow the air inside the Spot
Merchandiser to cool down.
Load Limits
Each merchandiser has a load limit decal.
At no time should merchandiser be
stocked beyond the load limits indicated.
If load limit is violated, it may result in
loss of contents.
P/N 2402398 A
2-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sm series

Table of Contents