Power
The ION ARA DOCK4 bump test and calibration station has two power sources. A 12V DC
mains power supply and an internal rechargeable battery.
The internal rechargeable battery provides approximately 5 hours of continuous
operation when fully charged (based on 4 x ARA's inserted).
The ION ARA DOCK4 will automatically switch itself off between tests if inactive for
2 minutes. This can be adjusted via ION ARA Dock4Manager software.
The power LED is green when it has sufficient charge or connected to mains power.
Power Button and Status Colours
Powers up the ION ARA DOCK4 bump test and calibration station.
Battery low
Setup and Installation
1. Loosen the lid cover bolts with a 3mm hexagonal wrench and open the lid to gain
access to the calibration gas compartment.
2. Insert the calibration gas into the housing and screw clockwise until seated.
Secure the cylinder with the bottle strap. Close the lid and fasten the cover bolts.
3. The calibration pressure gauge will indicate the amount of gas available.
4. Press the power button. The ION ARA DOCK4 bump test and calibration station is now
ready to use.
Default Gas Concentrations
The recommended default calibration gas concentrations are below:
ION ARA Models:
ARA100, ARA100H
ARA200, ARA200H
ARA300
ARA400
NOTE: These can be adjusted via ION ARA DOCK4 Manager and IR Link
Pioneering Gas Sensing Technology.
ionscience.com
Normal operation
Gas Type:
Hydrogen Sulfide (H2S)
Carbon Monoxide (CO)
Oxygen (O2)
Sulfur Dioxide (SO2)
ARA DOCK4 Bump Test &
Calibration Station
Quick start guide
Gas Concentrations:
25 ppm
100 ppm
18% Vol
10 ppm
1.
No USB
Part No: 908225 V1.0