HCD-GPX6/GPX7
3-12. LEVER (LOADING-L/R)
1
1
SPT-T (loading-R)
SPT-T (loading-L)
5 lever (loading-R)
2 two hooks
4 two hooks
3 lever (loading-L)
PRECAUTION DURING LEVER (LOADING R / L) INSTALLATION
– Bottom view –
Align the horizontal position.
lever (loading-L)
lever (loading-R)
Install the
both levers so that they move symmetrically.
14