Installation - Trane E50 Series Installation, Operation And Maintenance Manual

Compact power and energy meter bacnet tp
Table of Contents

Advertisement

Installation

Read the following guidelines before starting installation.
Mount the meter using one of the following two methods:
1. DIN Rail Mount
2. Screw Mount
BAS-SVX076C-EN
Disconnect power prior to installation.
Reinstall any covers displaced during installation before re-powering unit.
Mount the meter in an appropriate electrical enclosure near equipment to be monitored.
Do not install the load side of a variable frequency drive (VFD).
a. Attach mounting clips to the underside of housing by sliding them into the slots from the
inside.
N N o o t t e e : : The stopping pegs must face the housing and the outside edge of the clip must be
flush with the outside edge of the housing.
b. Snap the clips onto the DIN rail.
Insert clips from inside
a. Attach mounting clips to the underside of housing by sliding them into the slots from the
inside.
N N o o t t e e : : The stopping pegs must face the housing and the outside edge of the clip must be
flush with the outside edge of the housing.
Clip flush with
outside edge
Snap onto
DIN rail
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

E50h2-t2X13690276002

Table of Contents