Chapter 3: Installation
Unpack and inspect
MULTILIN DGPR – INSTRUCTION MANUAL

Installation

This chapter outlines installation of hardware and software.
Two people are required to unpack, lift, and place the unit.
1.
Before removing the DGPR unit from the shipping carton, screw the installation tools
provided into threaded holes E and F on the front of the unit, as shown.
Figure 4: Screw installation tools into holes E and F
2.
Lift and place the unit on a bench in a standing position. Do not lay the unit on the
back terminal blocks.
Laying the unit on the back terminal blocks can break the insulators.
3.
Leave the installation tools inserted in the holes. They are required to mount the unit in
the rack.