LG DLE3401 Series Owner's Manual page 24

Table of Contents

Advertisement

24 INSTALLATION
Four-Wire Direct Wire
• A 4-wire connection is required
for all mobile and manufactured
home installations, as well as all
new construction after January 1,
1996.
• A UL-listed strain relief is required.
• Use UL-listed 4-wire #10 AWG-
minimum copper conductor
cable. Allow at least 5 ft. (1.5 m)
of wire to allow for removal and
reinstallation of the dryer.
1
Remove 5-inch (12.7 cm) of the outer covering
from the wire. Remove 5-inch of insulation
from the ground wire. Cut off approximately
1.5-inch (3.8 cm) from the other three wires
and strip 1 inch (2.5 cm) insulation from each
wire. Bend the ends of the three shorter wires
into a hook shape.
1" (2.5 cm)
5" (12.7 cm)
2
Remove the terminal block access cover on
the upper back of the dryer.
3
Install a UL-listed strain relief into the power
cord through-hole.
4
Thread the 4-wire #10 AWG-minimum copper
power cable prepared in step 1 through the
strain relief.
UL-Listed 4-Wire Power Cord
5
Transfer the dryer's ground wire from behind
the green ground screw to the center screw of
the terminal block.
Ground Wire
Terminal Block
UL-Listed
Strain Relief
6
Attach the two hot leads of the power cord to
the outer terminal block screws.
7
Attach the white neutral wire to the center
screw of the terminal block.
8
Attach the power cord ground wire to the
green ground screw.
9
Tighten all screws securely.
10
Reinstall the terminal block access cover.
Hot (Black) Neutral (White)
Ground
Screw
Power Cord
Ground Wire
Hot (Red)
White Wire
moved from
Ground Screw

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dle3400 series

Table of Contents