IBM S922L Installing page 25

Table of Contents

Advertisement

Figure 8. Relative positions of the parts of the cable-management arm before assembly
2. The cable-management arm can be installed on either side of the server. For this procedure, it is
illustrated that you are installing it on the right side, while you are facing the server from the rear. If
you want to install the cable management arm on the other side of the rack, you can press the button
on the extension tab (1) so that it swivels in the opposite direction (2).
Figure 9. Swiveling the cable management arm extension tab
3. Insert the inner cable management arm tab (A) to the inner mounting bracket (B) until the outer
mounting bracket (D) clicks into place.
Installing the IBM Power System S922L (9008-22L)
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

9008-22l

Table of Contents