Appendix B - Cables And Connectors; Ethernet Cable - D-Link DGS-3000-28SC/A1A Hardware Installation Manual

Layer 2 gigabit stackable managed switch
Table of Contents

Advertisement

DGS-3000-28SC Layer 2 Managed Stackable Gigabit Switch Hardware Installation Guide
Appendix B – Cables and Connectors

Ethernet Cable

When connecting the Switch to another switch, a bridge or hub, a normal cable is necessary. Please review these
products for matching cable pin assignment.
The following diagrams and tables show the standard RJ-45 receptacle/connector and their pin assignments.
Contact
1
2
3
4
5
6
7
8
Figure B- 1. The standard RJ-45 port and connector
RJ-45 Pin Assignments
MDI-X Port
RD+ (receive)
RD- (receive)
TD+ (transmit)
1000BASE-T
1000BASE-T
TD- (transmit)
1000BASE-T
1000BASE-T
MDI-II Port
TD+ (transmit)
TD- (transmit)
RD+ (receive)
1000BASE-T
1000BASE-T
RD- (receive)
1000BASE-T
1000BASE-T
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-3000-28sc

Table of Contents