LG GoldStar MS-133SE Service Manual page 14

Table of Contents

Advertisement

D. PCB ASSEMBLY REMOVAL
1) Remove the control panel assembly from the
cavity. (Refer to control panel assembly removal
on previous page.)
2) Remove screws which hold the PCB SUB ASS'Y to
the control panel.
3) Disconnect the flat cable from the PCB SUB
ASS'Y and take off the PCB SUB ASS'Y
Control Panel
Key Membrane
Door Open Button Release
E. DOOR MAIN ASSEMBLY REMOVAL
1) Open the door.
2) Remove the choke cover cap very carefully with a
flat-blade screwdriver.
CAUTION : Be careful not to damage door seal plate
with the screwdriver.
3) Lift up and push the door.
NOTE:
1. After replacing the door, be sure to check that the
primary switch, monitor switch, and secondary switch
operate normally.
2. After replacing the door, check for microwave energy
leakage with a survey meter. Microwave energy must
be below the limit of 4 mW/cm. (with a 275 ml water
load)
3. When mounting the door assembly to the oven
assembly, be sure to adjust the door assembly parallel
to the chassis. Also adjust so the door has no play
between the inner door surface and oven frame
assembly. If the door assembly is not mounted
properly, microwaves may leak from the clearance
between the door and the oven.
PCB Sub Asm
Button Spring
Lever
Remove choke cover cap
F. AIR DUCT ASSEMBLY REMOVAL
1) Disconnect the leadwire from lamp and MGT
thermostat.
2) Remove the mounting screw to the magnetron.
5-4
Remove door
Door seal plate
Spacer

Advertisement

Table of Contents
loading

Table of Contents