Nokia 7390 Service Manual page 19

Table of Contents

Advertisement

CMO Operations & Logistics
Training and Vendor Development
Multimedia Creation & Support
13. Secure the UPPER C-COVER ASSY by pressing it into its
position.
15. Place the COAX GROUNDING SPRING over the connector.
17. Fit the CUI KEYS and check the right position.
Service Manual 7390 RM-140
Page
19
(47)
CONFIDENTIAL
14. After covering the display, gently close the COAX CONNECTOR.
16. Check the right position of the COAX CABLE.
18. Align the SECOND DISPLAY FRAME ASSY with the UPPER C-
COVER.
Copyright © 2006 NOKIA Corporation. All rights reserved.
Approved 2.0
MGR
31.Okt.2006

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rm-140

Table of Contents