Download Print this page

Installation - NewAir NBC096BS00 Owner's Manual

96-can black stainless steel beverage cooler
Hide thumbs Also See for NBC096BS00:

Advertisement

INSTALLATION

Before connecting the appliance to a power source, let it stand
upright for approximately 24 hours. This will reduce the
possibility of a malfunction in the cooling system from handling
during transportation.
Before operating your cooler for the first time, follow these steps:
Remove the exterior and interior packing.
Clean the interior surface of the unit with lukewarm water and a soft cloth.
Place the cooler on a level surface that will be strong enough to support
the unit when it is fully loaded. To level your cooler, adjust the front feet
located at the bottom of the unit.
HANDLE ASSEMBLY
Tools Required for Assembly: Phillips screwdriver (not included)
Estimated Assembly Time: 5 minutes
Before installation, attach the handle to the front of the unit with the
included screws. It may be necessary to push aside the rubber seal on the
inside of the door to reveal the screw holes.
Caution: Avoid over-tightening the screws, or you may cause damage to
the unit.
6
newair.com

Advertisement

loading