XII. Operation
E. Boiler Sequence Of Operation (continued)
5. Multiple Boiler Sequencer Screens
available
When the Sequence Master is enabled the following screen is
:
The Sequencer Status screen is selected by "pressing" "Status" button from the "Home" screen when Sequence
Master is enabled.
107672-03 - 5/18
114