Initial Connection And Operating - Dometic Go Power! Solar Flex Kit GP-FLEX-55 User Manual

Hide thumbs Also See for Go Power! Solar Flex Kit GP-FLEX-55:
Table of Contents

Advertisement

INSTALLATION

4.8 INITIAL CONNECTION AND OPERATING

1.
Check all electrical connections and ensure all cables are securely fastened
2.
Install the Fuse into the fuse holder, ensure the fuse holder is securely fastened
3.
Remove the opaque material from the solar panels
4.
Follow the solar charge controller user manual and operating steps
4.9 BATTERY BANK CONFIGURATIONS
Parallel: 2 x 12V
System Voltage = 12V
System Capacity = 200A/Hr
Fuse
12V
100A/hr @ 12V
12V
100A/hr @ 12V
Legend
Cable
Ring
Terminal
FIGURE 4-J: TYPICAL BATTERY BANK CONFIGURATIONS
Parallel: 4 x 12V
System Voltage = 12V
System Capacity = 400A/Hr
Fuse
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
100A/hr @ 12V
12V
Ring
100A/hr @ 12V
Terminal
Series: 2 x 6V
Series & Parallel: 4 x 6V
System Voltage = 12V
System Voltage = 12V
System Capacity = 200A/Hr
System Capacity = 400A/Hr
Fuse
Fuse
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
6V
200A/hr @ 6V
gpelectric.com | [page 15]

Advertisement

Table of Contents
loading

Table of Contents