Download Print this page

Pre-Installation: Receiving, Handling, And Storage - Eaton Power Xpert Instruction Booklet

Hide thumbs Also See for Power Xpert:

Advertisement

Power Xpert Solar DC
breaker recombiner
Pre-installation: receiving,
handling, and storage
Receiving
Upon delivery, use the packing list to confirm the number of items
against what was received to ensure that the shipment is complete .
Any discrepancies should be noted on the freight bill before signing .
Report any shortages or damage to the freight carrier immediately .
Immediately upon receipt of the Recombiner, the plastic covering
should be carefully removed and a thorough inspection of each
section should be made to detect any damage incurred during
shipment . Any damage should be noted on the bill of lading
(freight bill) and the consignee receiving the equipment should
notify the freight carrier . FAILURE TO NOTIFY THE FREIGHT
CARRIER OF DAMAGE IN A TIMELY MANNER MAY RESULT IN
THE CONSIGNEE ASSUMING THE COSTS ASSOCIATED WITH
REPAIR OR REPLACEMENT OF DAMAGED EQUIPMENT .
After inspection, it is recommended that a plastic covering be used
to protect the equipment from dust, dirt, moisture, and damage until
ready for installation .
The Recombiner should remain attached to its shipping skid until it
has been moved into its final installation position .
Handling
 WARNING
RECOMBINER IS TOP-HEAVY. USE CARE IN HANDLING.
Recombiners are top-heavy . Recombiner sections may weigh
more than 2000 pounds . Before moving or lifting, verify that the
equipment used to handle the Recombiner is within safe limits of
its lifting capacity .
Recombiner shipping lengths will vary . Each shipping section is
bolted with lag bolts to heavy wooden skids that extend beyond all
sides of the Recombiner .
Use of lifting means
Lifting means are bolted to each Recombiner shipping length .
Lifting a Recombiner by crane is the recommended method for
moving this equipment .
Lifting means
Figure 1. Typical indoor lifting means
Instruction Booklet IB015001EN
Lifting means
Figure 2. Typical outdoor lifting means
DO NOT pass cables or chains through the holes in the lifting
means . Use cables or chain with hooks or shackles rated for the
load and weight of the Recombiner shipping length to be lifted .
Prepare a sling and a spanner or spreader (see Figure 3 and
Figure 4) . Eaton does not provide chain, cables, shackles, hooks,
spanner, or spreader .
Spreader bar
Figure 3. Front view
Effective June 2015
EATON www.eaton.com
3

Advertisement

loading