Download Print this page

Advertisement

Quick Links

IENGLISHI
Compact Design Fits Around Most Electrical Panels
Dimensions: L: 8" x W: 6" x D: 4"
Dimensions: L: 203mm x W: 152mm x D: 101mm
1

Advertisement

loading

Summary of Contents for Black Box EVSW240-100

  • Page 1 IENGLISHI Compact Design Fits Around Most Electrical Panels Dimensions: L: 8” x W: 6” x D: 4” Dimensions: L: 203mm x W: 152mm x D: 101mm...
  • Page 2 240-208V, Single Phase – 25 Amp up to 60 Amp Breaker for 240-208V, Single Phase – 20 Amp up to 48 Amp Charger MODEL NUMBERS BY TYPE EVSW240-100 for 60, 100 Amp Electrical Service Beakers EVSW240-200 for 125, 150, 200 Amp Electrical Service Beakers Read and save these instructions...
  • Page 3: Table Of Contents

    The contents of this manual are subject to copyright protection and other intellectual property protection of Black Box Innovations Inc. and its licensors. Without the written consent of Black Box Innovations Inc. this installation manual cannot be modified, reproduced, or copied. The following logos are trade names or trademarks of Black Box Innovations Inc.
  • Page 4: Specifications

    IENGLISHI SPECIFICATIONS This device has a monitoring system that can protect an electrical distribution circuit by switching a load on or off based on its main breaker size and on what the system usage is. It will act to prevent systems connected to it from overloading the electrical distribution circuit. It does so by turning off the power to the load connected to it for the duration that the computational algorithm determines it is necessary as it relates to the main breaker sizing.
  • Page 5: Installation Diagram

    IENGLISHI INSTALLATION DIAGRAMS Alternate locations for devices installation are acceptable...
  • Page 6: Installation Instructions

    IENGLISHI INSTALLATION INSTRUCTIONS STEP 1: CHECK THE CONTENTS OF THE PACKAGE Model#: DEVICEXXX-XXX 1 x Controller & enclosure, 2 x Current monitoring devices 1 x Bag including miscellaneous pieces, 1 x Installation instructions STEP 2: PREPARING FOR THE INSTALLATION Disconnect power to all devices being worked on or within an unsafe distance to the working area.
  • Page 7 IENGLISHI Remove the two cover screws and enclosure cover. Attach the device securely to the desired location. Do not mount with the cover plate facing down. Remove the black internal control partition by unscrewing the two screws inside the enclosure. Install current monitoring devices on the main service wires to be monitored by clipping them onto each main line paying attention to the arrow inside the window and labeling that indicates the direction of...
  • Page 8 IENGLISHI seated well in each receptacle. (the correct polarity should have the red wire closest to the wall of the partition while the connector is plugged into the socket) 8. S et up switches and observation time dial as indicated in the chart and diagram later on in this document or the back of the cover of the enclosure.
  • Page 9 IENGLISHI Install enclosure cover and when safe to do so, energize the system. (Note: The contactor may not close until a computational observation time of between 0 - 10 minutes. The algorithm must be satisfied the system will remain below 80% of the rated main breaker and other values included in it. This is partially dependent on the setting of the timer adjustment screw (white) on the control board.
  • Page 10 IENGLISHI All settings are applicable for EV chargers or other loads that tolerate switching their power off when required Red LED: Power Green LED: Output White Dial Time Setting: 0-10 min. (Location of Dial and Switches may vary) Below Settings are for Main Breakers Rated at 80% Continuous Load Only Main Electrical End Device...
  • Page 11: Maintenance

    IENGLISHI STEP 4: TEST FOR OPERATION Test device for correct operation. Warning: Warranty VOID if any devices are installed incorrectly. MAINTENANCE Do not use any cleaning solvents on the devices. Electrical connection must be inspected, maintained, and re-torqued every year by qualified personnel to maintain safe and proper operation.
  • Page 12 IENGLISHI contactor are secure. Once this is confirmed, then check that the wire connectors on each side of the contactor coil are secure. If they are secure, next check the field- installed wires in the contactor lugs on both the line side and load side are properly installed and that voltage is present on the line side wires.
  • Page 13 IENGLISHI good at all locations, then the most common cause of an abnormally noisy contractor that is still operating normally is dust or other particles in the active part of the contactor. The contactors can be disassembled, and surfaces can be cleaned to remedy this.
  • Page 14: Information

    IENGLISHI INFORMATION This document contains important instructions Do not modify, repair, or dismantle the device. which must be followed during the installation, maintenance of this device. Never introduce water or any other liquids to the area around or on this device. Notes Do not install the device near flammable After installation verify that the device is...
  • Page 15 6 & 7 and in accord with the rest of this If, in the opinion of Black Box Innovations document. Inc. installation has been done incorrectly, or the device is used inappropriately, or repairs...

This manual is also suitable for:

Evsw240-200