4.3.2 Preparing for wall mounting
To securely fasten the SICHARGE UC dispenser to the intended mounting surface, you must
prepare the mounting surface.
CAUTION
Secure work area
Ensure a sufficiently large safety zone around the mounting surface. For example, use warning
signs and barriers.
Cable entry position
The following figure shows the position of cable entry from below into the SICHARGE UC dispenser with
the option to connect additional dispensers (daisy chain).
Cable glands for DC cable and PE cable
a
Cable gland for AC cable
s
Ethernet cable gland
d
Figure 4-8
Cable entry for wall/ceiling mounting
You will find a table with the connection plan for connection to the SICHARGE UC charging station and
the cable diameters in the section Technical specifications (Page 106).
Operating Instructions | SICHARGE UC Dispenser UL
41