Operation; Maintenance - U-Line H-2813-S1 Manual

Ice melt spreader
Table of Contents

Advertisement

Available languages

Available languages

1.
Ensure gate control is in the closed position.
(See Figure 5)
Figure 5
Not Fully Closed
NOTE: Do not hold bail down when filling. If
gate is not fully closed, see Figure 2C for
adjustment.
2. Determine appropriate setting for material being
used by reading the suggested setting on the
material's bag. Be sure to read the instructions on
the bag/box of the spreading material to identify
accurate setting needed.
• When finished spreading, empty any remaining
material.
• Use garden hose to wash down the spreader after
each use.
• Do not point hose directly onto the gear box.
PAGE 3 OF 9

OPERATION

Closed

MAINTENANCE

1-800-295-5510
uline.com
3. To begin spreading, start walking and pull the bail
system down to open gate.
4. To stop spreading, let go of the bail and the gate
will close.
BAFFLE OPERATION
1. Adjust baffle by hand to block distribution
accordingly.
2. Use wing nuts to adjust tension on baffles.
GRATE
If salt or spreading material is too large for the grate,
remove grate before use.
• It is recommended not to use a power washer on
the spreader.
• Allow to dry before storing.
0222 IH-2813-S1

Advertisement

Table of Contents
loading

Table of Contents