2- Relief Valve; 3- Regulator(S); 4- Gas Control Module - Honeywell HON COCON 13 Operator's Manual

Underground gas regulation station
Table of Contents

Advertisement

 
15 
Relatch the ssd controller (take note of the minimal relatching differential) by first backing out the adjust 
screw of the regulator pilot and then decreasing the downstream pressure by opening & closing the purge 
valve. Equalize pressure over the closing member by using the built‐in bypass (push the reset‐button as 
previously described) Finally relatch the SSV by pushing the button all the way to its stop (push  twice) 
16 
Re‐check the upper trip pressure and fine‐adjust if necessary by repeating actions 13 to 15 
 
Note: re‐latch the ssd controller each time at approximately the same set pressure 
 
 
4.3.2.2 – Relief Valve (optional)  
 
  
Start at 4.3.2.1 (first time only) 
 
 
1
Check if the discharge line of the relief valve has been provided with an  
open indicator  
 
Increase the downstream pressure to the desired set point of the relief valve  
2a 
if necessary decrease initially the downstream pressure by opening & closing the purge valve 
2b 
by advancing the adjust screw (CW) of the regulator pilot (do not open the hand relief) 
 
Slowly decrease the opening pressure spring tension  
3a 
by backing out the adjust screw (CCW) of the relief valve 
3b 
until the relief valve opens (use an indicator) 
 
Close the relief valve (mind the minimum closing difference) 
4a 
by first backing out the adjust screw of the regulator pilot  
4b 
decrease the downstream pressure by opening & closing the purge valve  
 
 
Check the discharge line for lockup 
 
 
Check the opening pressure and fine‐adjust if necessary 
6a 
by repeating action 2 u/i 4 
If applicable remove the opening indicator & restore any changes made to the tubing 
 
 
 
4.3.2.3 – Active and Monitor Regulator 
 
  
Start at 4.3.2.1 (first time only) 
 
 
Decrease the downstream pressure to just below the set point of the regulator. This can be done by opening 
& closing the hand relief valve.(purge) 
1a 
Then advance the adjusting screw (CW) of the regulator pilot (do not open the purge valve) until the set 
point of the regulator is reached. 
Check the downstream pressure for lockup. 
 
4.3.2.4 – Gas Control Module 
 
Check the atmospheric upper chamber for leakages with a leak detector before commissioning. 
 
 
 
Operators manual underground gas pressure reducing station