Prepare The Location; Prepare Range Hood - Samsung NK30B3500US Manual

Table of Contents

Advertisement

Installation Instructions

Prepare the location

A
1. If cabinet has recessed bottom, add wood filler strips on each side.
Install 4 flat head wood screws with washers and nuts to attach filler
strips in locations shown.
NOTE
For installations to a surface other than drywall, it is recommended that a
qualified contractor determine the anchoring method.
NOTE
Consider use the A measure for 7"(17.8 cm) round transition and B
measure for recirculating system.
B
A. 14½" (36.7 cm)
B. 12 1/4" (31.1 cm)
2. Remove the grease filter by pulling the filter latch toward the back of
the range hood and using a Torx T10 adapter, remove the screw from
the filter retainer.
3. Remove the lateral panels by pulling them horizontally to the back of the
hood and then release the brackets on the front.
4. Using 2 or more people, lift the range hood up under cabinet and
determine final location by centering beneath cabinet. Mark on the
underside of cabinet the location of the 4 keyhole mounting slots on
the range hood (A)
8
English
Wood filler strips
(recessed cabinet
bottoms only)
Cabinet
A
bottom
A
NOTE
Mark the thin area of the slot. On the back wall mark the holes for the
security screws (B). Set range hood aside on a covered surface.
Wall
5. Use
" (3 mm) drill bit and drill 4 pilot holes.
1
8
NOTE
Make the drill holes on the thin area of the slot.
Install the 4 - .45 cm x 1.3 cm mounting screws in pilot holes. Leave
about ¼" (6.4 mm) space between screw heads and cabinet to slide
6. Use
" (8mm) drill bit and drill 2 pilot holes in the marks for the
8
2 5
security screws, then place the drywall anchors.

Prepare Range Hood

1. Set the range hood on its back on a covered surface.
2. Unscrew and remove junction box cover
A
A. Keyhole slot
A
A. Drill pilot hole
range hood into place
1⁄4"
(6.4 mm)
B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents