Advertisement

Quick Links

17-DEC-2008 Sub. No. 2008-5180
(Commander I JC2 PCP sticker English)
Competition Inc.
12775 rue Brault
Mirabel, Québec, Canada J7C 0C4
Tel: 450-437-2420
REGISTRATION NO. 25615.01
PEST CONTROL PRODUCTS ACT
COMMANDER I
MODEL JC5
Maximum output of Sodium Hypochlorite
equivalent to 0.11 kg of chlorine per day
WARNING: Operating the
COMMANDER I Model JC5 unit without
water flow through the cell can cause a
build up of flammable gases which can
result in
FIRE OR EXPLOSION
DOMESTIC
READ THE LABEL AND THE
INSTRUCTION MANUAL
BEFORE USING

Advertisement

Table of Contents
loading

Summary of Contents for Jacuzzi COMMANDER I JC2

  • Page 1 17-DEC-2008 Sub. No. 2008-5180 (Commander I JC2 PCP sticker English) Competition Inc. 12775 rue Brault Mirabel, Québec, Canada J7C 0C4 Tel: 450-437-2420 REGISTRATION NO. 25615.01 PEST CONTROL PRODUCTS ACT COMMANDER I MODEL JC5 Maximum output of Sodium Hypochlorite equivalent to 0.11 kg of chlorine per day...
  • Page 2 Soft Water Purification System C O M M A N D E R I By Jacuzzi DOMESTIC Installation / Operation Manual MODEL JC2 REGISTRATION NUMBER 25616.01 PEST CONTROL PRODUCTS ACT MODEL JC5 REGISTRATION NUMBER 25615.01 PEST CONTROL PRODUCTS ACT PLEASE RETAIN OWNER'S MANUAL FOR FUTURE REFERENCE IMPORTANT READ THE LABEL AND THIS MANUAL BEFORE INSTALLING &...
  • Page 3: Table Of Contents

    TABLE OF CONTENTS Models: JC2 & JC5 Important Safety Instructions i,ii Health, General & Hyperthermia Specifications Section 1 Water Pretest & Preparation System Sizing Pool Water Preparation & Monitoring Section 2 Plumbing Requirements Material Requirements for Installation Cell Installation & Pool Diagrams 8, 9 Section 3 Control Panel Mounting &...
  • Page 4: Important Safety Instructions I,Ii

    IMPORTANT SAFETY INSTRUCTIONS READ AND FOLLOW ALL INSTRUCTIONS EQUIPMENT RELATED, INSTALLATION AND GENERAL USE Installation of all COMMANDER I models When installing and using the COMMANDER I unit, basic safety precautions must always be followed, including the following: 1. Follow all aspects of the local and National Electrical Code(s) when installing the COMMANDER I unit.
  • Page 5 IMPORTANT SAFETY INSTRUCTIONS 110V Models Only (cord and plug) 1. WARNING - Risk of Electric Shock. Connect only to a grounding type receptacle protected by a ground-fault-circuit-interrupter (GFCI). Contact a qualified electrician if you cannot veri- fy that the receptacle is protected by a GFCI. The conductors on the load side of the GFCI shall not occupy conduit boxes or enclosures containing other conductors unless the additional conductors are also protected by a GFCI.
  • Page 6: Health, General & Hyperthermia

    HEALTH, GENERAL & HYPERTHERMIA HEALTH, GENERAL AND HYPERTHERMIA General: WARNINGS - To reduce the risk of injury: 1. People using medications and/or having an adverse medical history should consult a physician before using a spa, hot tub or pool. 2. People with infectious diseases should not use a spa, hot tub or pool. 3.
  • Page 7: Specifications

    Specifications Specifications ALL MODELS INPUT: 105 – 125 VAC, 50/60 HZ, 1.0 Amp for Model JC2-1 or JC5-1 210 – 250 VAC, 50/60 HZ, 0.5 Amps for Model JC2-2 or JC5-2 Outputs Model JC2 Cell Maximum output of Sodium Hypochlorite equivalent to 0.11 kg. of chlorine @3.0 Amps per 24 hours @max.
  • Page 8: System Sizing

    Section 1 a System Sizing for Swimming Pools System Sizing Use these three formulas to calculate the volume of water in the pool/spa: Rectangular Pool: Length(M) x Width(M) x Average Depth(M) x1000 = Total Litres Oval / Round Pool: Diameter (M) x Diameter (M) x Average Depth (M) x 790 = Total Litres Free Form Pool: Average Length (M) x Average Width (M) x Average Depth (M) x 1000 = Total Litres COMMANDER I System Production Capacity...
  • Page 9 Section 1 a System Sizing for Swimming Pools (Continued) 2. Purifier Production/ System Sizing/ "Rules of Thumb" demand While purifier varies beyond precise prediction, and you may desire a higher or lower purifier residual in your pool, the following "rules of thumb" will assist you in properly selecting the correct COMMANDER I model.
  • Page 10: Pool Water Preparation & Monitoring

    Section 1 b Pool Water Preparation & Monitoring STEP 1 - Proper Water Balance Requirements: Proper COMMANDER I System operation is dependent on proper pool water conditions. Manually balance the pool water chemistry to meet all suggested ranges of water balance factors listed below before start- up of the COMMANDER I unit.
  • Page 11 Section 1 b Salt Requirements Needed for 3000 PPM KILOGRAMS OF SALT NEEDED FOR 3000 PPM RESIDUAL Salt Level Pool / Spa Volume in 1000’s of Litres Before Addition 320 ppm 640 ppm 960 ppm 1280 ppm 1600 ppm 1920 ppm 2240 ppm 2560 ppm 2880 ppm...
  • Page 12: Material Requirements For Installation

    Section 2 a Material Requirements for Installation NEEDED BY INSTALLER SUPPLIED WITH COMMANDER I UNIT Required amount of salt 1) Residential Installation /Operation Hacksaw, Pipe Cutters or Cable Saw Manual Limited Warranty with Warranty Tape measure & Permanent Marker Card (Must Return) Screwdrivers: Flat head &...
  • Page 13: Cell Installation & Pool Diagrams

    Section 2 b Control Panel & Cell Installation Control Panel Using the supplied anchors and screws, the Control Panel should be mounted on a flat, sturdy, vertical surface away from direct exposure to sunlight. The Control Panel is equipped with a 3.65 m DC cell cord and flow detector cord.
  • Page 14 Section 2 b In-Line Cell Installation Locations NOTE: See diagrams below for the proper location of the flow detector and cell, so not to over chlorinate/brominate the spa. Pool/Spa Flow Three Way Pump (Motorized) Valve Install Flow Detector(s) & Cell Here Single Pump Pool /Spa Combination NOTE: If this scheme is desired and the spa is raised, a Swing Check Valve must be installed after the three way Return (Motorized) Valve on the Spa Jet line to ensure spa drain down does not occur.
  • Page 15: Wiring

    Section 3 a Control Panel Wiring 220V MODELS ONLY (You cannot switch to 110 volt power) STEP 1 - Wiring All electrical equipment must be located 1.50 m or more from closest pool or spa waterline. Use the green and yellow stranded wire for Control Panel grounding. Attach a #8 or #6 solid bond wire to the bonding lug on the underside of the unit.
  • Page 16: General Information

    Section 3 b Electronic Component Location JC2 and JC5 a) ORP Controller - Install part # 993 per the instructions provided. NOTE: This is a dry contact input, DO NOT ENERGIZE THIS INPUT! DAMAGE TO THE CONTROL PANEL WILL OCCUR AND THE WARRANTY WILL BE VOIDED. When an ORP controller is interfaced to the COMMANDER I unit, your Output Control Dial should be set on 100%.
  • Page 17: Control Panel Indicators

    COMMANDER I Models JC2 & JC5 Control Panel Functions Section 4 a Indicator Lights A. WHEN POWER IS FIRST TURNED ON: The lights will flash alternately for one minute while the COMMANDER I unit self-tests and awaits continuous flow. B. OK: If your COMMANDER I unit is wired properly, this indicator will display GREEN whenever the main filter pump is operating.
  • Page 18: Start Up Sequence

    COMMANDER I JC2 & JC5 Control Panel Functions (Cont’d) Section 4 a Once a bromine pool -Always a bromine pool. Use Of Sodium Bromide SODIUM BROMIDE (OPTIONAL) - 100 PPM Where Cyanuric acid is not available or where its use is restricted, bromine can be used as an alternative purifier to chlorine.
  • Page 19: Trouble Shooting

    PROBLEM /CAUSE SOLUTION___________________________ 1. Insufficient purifier production. A. The test kit reagents or test strips are old or expired. A. Retest with new reagents or test strips. B. The unit is set too low in relation to an increased purifier demand B.
  • Page 20 PROBLEM CAUSE SOLUTION___________________________ 7. Single CHECK SYSTEM Flash A. Water exiting the filter is being diverted away from the inlet of the flow detector A. Increase the flow rate above 15 gallons (56 LPM) per minute to activate the flow detector. B.
  • Page 21 SUMMARY OF COMMANDER I UNIT OPERATING MODES LOW FLOW/ORP (Blue) CELL MAIN FLOW (White) C O M M A N D E R I U N I T P R I N T E D C I R C U I T BOT T O M P A N E L O F THE C O M M A N D E R I UNI T B O A R D M O D E...
  • Page 22 Above Ground Pool Installation Locations Appendix Appendix CONFIGURATION 1: Typical End-of-line Cell Installation (With or without Flow Switch) Install per diagram below. Ground Mounting Kit consists of: (2) 91.5 cm - 1.9cm x 1.9cm x .3cm (3' - 3/4" x 3/4" x 1/8") aluminum angles with four predrilled 0.156 in.
  • Page 23 CONFIGURATION 2: Typical End-of-line Convection Installation (Flow Switch Disabled) For 24 Hour Operation As A "Convection Style" Unit OXYGEN BUBBLES GENERATED WITHIN THE CELL CAN BE UTILIZED TO CREATE FLOW. STEP 1 Disconnect the cell flow switch cable mounted with the cell. Plug the shorting plug (included in the convection installation kit) into the back 2-circuit connector input (plug closest to wall at bottom of Control Panel).
  • Page 24: Appendix - Service Information

    To obtain service for your COMMANDER I system, contact the Dealer/Service Centre listed below, or: Competition Inc., 12775 rue Brault, Mirabel, Québec, Canada J7J 0C4 (450) 437-2420 If warranty service is being requested, you must provide a copy of your registered warranty card as proof of purchase.
  • Page 25 ****************************** This label transcript service is offered by the Pest Management Regulatory Agency to provide efficient searching for label information. This service and this information do not replace the official hard-copy label. The PMRA does not provide any guarantee or assurance that the information obtained through this service is accurate, current or correct, and is therefore not liable for any loss resulting, directly or indirectly, from reliance upon this service.

This manual is also suitable for:

Commander i jc525616.0125615.01

Table of Contents