Rigging

Rigging holes are provided on all models. Caution should be
exercised when moving these units. To prevent damage to
the unit housing during rigging, cables or chains used must
be held apart by spacer bars. The mounting platform or base
should be level and located so as to permit free access of
supply air. The unit weather hood may be removed for the
rigging process. The condensing unit cover (wrapper) should
be left in place.
Access Requirements
Provide adequate space at the compressor end of the unit for
servicing. Provide two (2) feet of space above unit for service.
Trim Ring
Installation
Detail
Evaporator Grill

Inspection

1. Each shipment should be carefully checked against the
bill of lading.
2. The shipping receipt should not be signed until all items
listed on the bill of lading have been accounted for.
3. Check packaging for signs of damage.
4. Any shortage or damages should be immediately
reported to the delivering carrier.
5. Damaged material becomes the delivering carrier's
responsibility, and should not be returned to the
manufacturer unless prior approval is given to do so.
6. When unpacking the system, care should be taken to
prevent damage.
7. Avoid removing the shipping base until the unit has been
moved to the final destination.
8. Complete warranty return card for each unit and mail to
Heatcraft Refrigeration Products.
TABLE 4 Control Factory Default Settings
PTT
Temperature
Models
Set Points
H - Cooler Models
38˚F
Air Defrost
M - Cooler Models
34˚F
Electric Defrost
L - Freezer Models
-10˚F
Electric Defrost
Trim Pieces (4)
Overlap as Shown
Ceiling of Walk-in.
Self Drilling Screw
Defrost
Start Times
4 / day
4 / day
4 / day

Mounting

The system requires an opening in the ceiling to the
dimensions stated on page 3. Mounting rails are located
at both ends of the chassis. Mounting rails may be used to
attach unit to ceiling. Through-bolts should be insulated or
non-conductive to prevent sweating. The chassis is weather
stripped around the air grille and will seal to the box roof.
The trim ring (shipped loose), when provided, should be
installed around the air diffuser when secured with the
hardware provided. Be sure to adhere to your local standard
construction codes.
General Safety Information
1. Installation and maintenance to be performed only by
licensed contractor.
2. Ensure that the structural integrity of the box can
withstand the weight of the
weights).
3. Avoid contact with sharp edges and coil surfaces.
They are a potential injury hazard. Wear gloves during
moving and rigging.
4. Make sure all power sources are disconnected before
any service work is done on units.
Changing the EZY
1. Press Set button and hold in until the display flashes "PS".
2. Press the Set Button and the display will change to "0" and
will begin to flash.
3. Press the up button until "22" is displayed.
4. Press the Set button.
5. Press the down button 2 times. "EZY" will be displayed.
6. Press the Set button.
7. Select the proper number for the model needed by
pressing the up or down key.
• 1 - L Low temperature model
• 2 - M Med temperature model
• 3 - H High temperature model
8. Press Set and wait for unit to return out of programming
mode.
9. Disconnect power
10. Press the Set Button while turning unit On
11. "CE" should display to verify programming display
Defrost Duration
Drip
(Maximum)
Time
60 min.
40 min.
2 min.
40 min.
2 min.
(See page 2 for unit
Fan
Defrost Termination
Delay
Set Point
38˚F
2 min.
65˚F
2 min.
65˚F
EZY