Rigging; General Unit Requirements - American Standard YC 100B Series Installation Operation & Maintenance

Packaged gas electric 12-1/2 thru 25 ton
Table of Contents

Advertisement

Table 3-3
Downflow Unit Supply & Return Air Opening Dimensional Data
UNITS
A
B
YC D 100B 22-7/16
14-1/2
YC D 125C
YC D 150D
YC D 151C
YC D 155B 26-7/16
22-1/2
YC D 175C
YC D 180B
YC D 210C
YC D 181C
YC D 200B
YC D 211C
YC D 240B 26-7/16
28-3/4
YC D 241C
YC D 250B
YC D 300B
YC D 301C

Rigging

A Rigging illustration and Center-of-Gravity dimensional data
table is shown in Figure 3-5. Refer to the typical unit operat-
ing weights table before proceeding.
1. Remove the shipping crate from around the unit. Do not
remove the crating from the top of the unit as illustrated in
Figure 3-5.
2. Rig the unit as shown in Figure 3-5. Attach adequate
strength lifting slings to all four lifting brackets in the unit
base rail. Do not use cables, chains, or slings except as
shown.
3. Install a lifting bar, as shown in Figure 3-5, to protect the
unit and to facilitate a uniform lift. The minimum distance
between the lifting hook and the top of the unit should be
7 feet.
4. Test-lift the unit to ensure it is properly rigged and bal-
anced, make any necessary rigging adjustments.
5. Lift the unit and position it into place.
6. Downflow units; align the base rail of the unit with the curb
rail while lowering the unit onto the curb. Make sure that
the gasket on the curb is not damaged while positioning
the unit.
Unit
Gravity (in.)
Models
Length
Width
YC*125C
42
26
YC*150D
46
29
YC*151C
45
30
YC*155B
45
29
YC*180B
43
29
YC*181C
52
35
YC*175C
46
29
YC*210C
46
29
YC*211C
53
35
YC*200B
52
33
YC*240B
51
34
YC*241C
53
34
YC*250B
53
33
YC*300B
53
33
YC*301C
53
34
* Downflow or Horizontal
General Information
C
D
E
17-11/16
4-1/4
18-11/16
4-1/4
19-15/16
4-1/4
F
G
H
4-1/4
54-13/16 47-3/16
4-1/4
62-7/16 54-11/16
4-1/4
76-5/16 68-11/16
Figure 3-5

General Unit Requirements

The checklist listed below is a summary of the steps required
to successfully install a commercial unit. This checklist is in-
tended to acquaint the installing personnel with what is re-
quired in the installation process. It does not replace the de-
tailed instructions called out in the applicable sections of this
manual.
[ ] Check the unit for shipping damage and material short-
age; file a freight claim and notify appropriate sales repre-
sentative.
[ ] Verify that the installation location of the unit will provide
the required clearance for proper operation.
11
J
Drain
24-5/8
1 N PT
25-5/8
1 N PT
26-3/4
1 N PT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents