OD Temp. (°F)
52
45
51
55
65
75
85
95
105
115
125
OD Temp. (°C)
361
7
11
13
18
24
29
35
41
46
52
COOLING OPERATION (SIZES 024-042)
With a call for cooling (Y/Y2), the indoor fan energizes immedi-
ately whereas the contactor energizes after a 5 minute time delay
(in case of initial start-up) starting the compressor and the outdoor
fan motor. When the cooling demand is met, Y/Y2 de-energizes,
shutting the compressor, indoor fan and the outdoor fan.
COOLING OPERATION (SIZES 048 AND 060)
These units utilize a 2 stage indoor thermostat. With a first stage
call for cooling (Y1), the indoor fan (low stage) energizes
immediately whereas the contactor energizes after a 5 minute time
delay (in case of an initial start-up) starting the compressor (low
stage) and the outdoor fan motor. If the low stage operation cannot
satisfy the cooling demand, the second stage cooling (Y2) ener-
gizes switching the compressor into high stage cooling through
energizing an internal solenoid valve inside the scroll compressor
and switching the indoor fan into high stage. When second stage
cooling is satisfied, Y2 de-energizes switching the compressor and
the indoor fan into low stage cooling. When the low stage cooling
demand is met, Y1 de-energizes shutting the compressor, indoor
fan and the outdoor fan.
HEATING OPERATION (SIZES 024-042)
With a call for heating (Y1), the indoor fan (low stage) energizes
immediately whereas the contactor energizes after a 5 minute time
delay (in case of initial start-up) starting the compressor and the
outdoor fan motor. If Y/Y2 cannot satisfy the heating demand, the
auxiliary or backup heat (W2) energizes. In case of staged heating,
W3 is energized if the demand is not met. The highest airflow
selected is run while the electric heat is in operation. When heating
demand is met, W3, W2 and Y/Y2 sequentially de-energize
shutting the compressor, indoor fan and the outdoor fan.
HEATING OPERATION (SIZES 048 AND 060)
With a first stage call for heating (Y1), the indoor fan (low stage)
energizes immediately whereas the contactor energizes after a 5
minute time delay (in case of initial start-up) starting the compres-
sor (low stage) and the outdoor fan motor. If the low stage
oepration cannot satisfy the heating demand, the second stage
Table 8—Cooling Charging Chart
SUCTION LINE TEMPERATURE (°F)
Suction Line Pressure (PSIG)
54
56
59
61
55
60
64
69
53
57
62
53
SUCTION LINE TEMPERATURE (°C)
Suction Line Pressure (kPa)
370
387
405
423
13
15
18
21
12
14
16
12
64
67
70
73
66
70
57
62
66
71
56
61
53
442
462
482
502
19
21
14
17
19
21
13
16
12
heating (Y2) energizes switching the compressor into high stage
heating through energizing an internal solenoid valve inside the
scroll compressor and switching the indoor fan into high stage. The
auxiliary or backup heat is controlled by a third stage (W2). If the
demand is not met, W3 is energized in case of staged heating.
When heating demand is satisfied, W3, W2 and Y2 sequentially
de-energize switching the compressor and the indoor fan into low
stage heating. When the low stage heating demand is met, Y1
de-energizes shutting the compressor, indoor fan and the outdoor
fan.

CONTINUOUS FAN

With the continuous Indoor fan option selected on the thermostat,
G is continuously energized. In case of 024-042 units, the selected
airflow setting is provided. In case of 048 and 060 units, the
system runs low stage (Y1) airflow for continuous fan operation.

DEFROST

Defrost board (DB) is a time and temperature control, which
includes a field-selectable time period between checks for defrost
(30, 60, 90 and 120 minutes). The time period is factory-set at 60
minutes and should only be adjusted by a trained service person.
Electronic timer and defrost cycle start only when contactor is
energized and defrost thermostat (DFT) is closed.
Defrost mode is identical to Cooling mode. The outdoor fan motor
stops because of "OF1" and "OF2" contacts opening on the defrost
board, a bank of optional electric heat turns on to warm air
supplying the conditioned space.

ELECTRIC RESISTANCE HEATING

If accessory electric heaters are installed, on a call for "Emergency
Heat" the thermostat energizes W which energizes the heater relay
and in turn energizes the electric heaters. The IFR is energized
which starts the indoor-fan motor. If the heaters are staged, W2 is
energized when the second stage of heating is required. When the
need for heating is satisfied, the heater and IFM are de-energized.
To ensure continuing high performance, and to reduce the possi-
bility of premature equipment failure, periodic maintenance must
14
76
79
82
85
75
66
71
76
58
63
67
72
50
54
58
62
50
53
57
49
52
55
50
53
523
544
566
589
24
19
22
24
14
17
20
22
10
12
14
17
10
12
14
9
11
13
10
11
MAINTENANCE
89
92
66
60
64
58
61
56
59
612
636
19
16
18
14
16
13
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents