Mechanism Assembly/Disassembly Procedure Table - JVC SR-VS30E/EK Service Manual

Table of Contents

Advertisement

2.7

MECHANISM ASSEMBLY/DISASSEMBLY PROCEDURE TABLE

Step
/Loc
No.
1
A Cassette housing assembly/ B Mechanism assembly
2
1 Drum assembly
3
2 Motor bracket assembly
4
3 Middle catcher assembly
5
4 Reel cover assembly
6
5 Pinch roller arm assembly
7
6 Sub brake assembly
8
7 Band arm plate sub assembly
9
8 Tension arm sub assembly
10
9 EXIT guide arm assembly
11
10 Swing arm assembly
12
11 Sub deck assembly
13
12 Main brake (Sup) assembly
14
13 Main brake (Take up) assembly
15
14 Reel disk assembly (Sup)
16
15 Reel disk assembly (Take up)
17
16 Prism
18
17 Control plate
19
18 Guide rail (Take up) assembly
20
19 Guide rail (Sup) assembly
21
20 Base plate assembly
22
21 Ent. guide base assembly
23
22 Worm wheel 2
24
23 Timing belt
25
24 Center gear assembly
26
25 Reel drive pulley assembly
27
26 Push plate
28
27 Clutch lock gear(2)
29
28 Clutch lock gear (1)
30
29 Tension control arm assembly
31
30 Brake control arm assembly
32
31 Charge arm assembly
33
32 Connect gear 2
34
33 Connect gear 2
35
34 Rotary encoder assembly
36
35 Main cam
37
36 Arm gear 1 assembly
38
37 Centering arm assembly
39
38 Sub cam
40
39 Arm gear 2 assembly
41
40 Clutch lock lever assembly
42
41 Capstan motor
43
42 Drum base deck
2-24
Part Name
Table 2-7-1
Fig.
Point
No.
T 2-13-1 2(S1),(L1) – (L5)
T 2-13-2 3(S2)
T 2-13-2 4(S2)
T 2-13-3 3(S2)
T 2-13-3 (S2), 2(L6)
T 2-13-4 (W1), (L7)
T 2-13-4 (P1), (W1), (L8)
T 2-13-4 (S3), (L9), (P2), (W2) 7,8
T 2-13-4 (P3)
T 2-13-5 (W1)
T 2-13-5 —
T 2-13-6 4(S2)
T 2-13-6 (P4), (L10)
T 2-13-6 (P5), (L11)
T 2-13-7 —
T 2-13-7 —
T 2-13-7 (S2)
T 2-13-7 2(L12)
T 2-13-8 4(S2)
T 2-13-8 (S2), 2(L13)
T 2-13-8 (S2), 2(L14)
T 2-13-9 (S2)
T 2-13-9 —
T 2-13-9 —
T 2-13-9 —
T 2-13-10 (W1)
T 2-13-10 (W1)
T 2-13-10 (W3)
T 2-13-10 (P6)
T 2-13-11 (L15)
T 2-13-11 (W1), (L16)
T 2-13-11 (L17)
T 2-13-12 (S2)
T 2-13-12 (S2)
T 2-13-13 2(S2)
T 2-13-13 (W1)
T 2-13-13 Collar
T 2-13-13 (L18)
T 2-13-14 (S2)
T 2-13-14 —
T 2-13-14 (L19)
T 2-13-15 (P7), Adjust nut
T 2-13-15 3(S2)
Note
Discription
1
2,3
2,4
5
6
8
Position alignment
9
Position alignment
10
Position alignment
10
Position alignment
11
Phase alignment
12
Position alignment
12
Position alignment
13
Position alignment
(Phase alignment)
(Phase alignment)
14
Phase alignment
15
Phase alignment
15,16 Position alignment
15
Position alignment
17
Phase alignment
17
Position alignment
17,18 Position alignment
Vertical adjustment

Advertisement

Table of Contents
loading

Table of Contents