4.4 Start-Up and Adjustment

▲ ▲
WARNING
!
CARBON MONOXIDE POISONING HAZARD
FAILURE TO FOLLOW THE INSTALLATION
INSTRUCTIONS FOR THE VENTING SYSTEM
BEING PLACED INTO OPERATION COULD
RESULT IN CARBON MONOXIDE POISONING OR
DEATH.
FAILURE TO FOLLOW THIS WARNING COULD
RESULT IN SERIOUS INJURY, DEATH, OR PROP-
ERTY DAMAGE.
▲ ▲
WARNING
!
FIRE OR EXPLOSION HAZARD
FAILURE TO FOLLOW STARTUP AND CHECK-
OUT PROCEDURES COULD RESULT IN SERIOUS
INJURY, DEATH, OR PROPERTY DAMAGE.
▲ ▲
WARNING
!
ELECTRICAL HAZARD
DISCONNECT POWER BEFORE INSTALLING
OR SERVICING. FAILURE TO FOLLOW THE
SAFETY WARNINGS EXACTLY COULD RESULT
IN SERIOUS INJURY, DEATH, OR PROPERTY
DAMAGE.
▲ ▲
!
In case of an electrical power failure while the boiler
is working, the burner will be de-energized and
automatically fi re when power is restored.
Determine that the water pump(s) are operating
properly.
Test low water cutoffs, automatic feed controls, pressure,
and temperature limit controls, and relief valves to
determine they are in operating condition.
Preliminary Inspections
System Start-Up and Adjustment must be carried out
by qualifi ed installers.
The following checks must be made at Start-Up and
whenever maintenance or service is performed:
With electrical power "OFF" and fuel line valve
"OFF"
1.
Verify the boiler system is fi lled with water
and make sure all the air in the hydronic
system, including boiler, has been vented.
2.
Verify there are no water leaks in the boiler or
system.
NOTE: Maximum operating pressure is printed
on the boiler data plate. Do Not exceed this
pressure and Do Not plug the system pressure
relief valve.
3.
Verify the electrical system is properly con-
nected and grounded.
18-CG03D1-4
58
CAUTION
4.
Visually inspect the venting system for proper
size, horizontal pitch and vent termination,
and verify the vent system is not blocked or
restricted, does not leak, has no corrosion and
any other defi ciency which could cause and
unsafe condition.
5.
Determine that the chimney or vent is accepta-
ble to the authority having jurisdiction.
6.
Make sure there are no fl ammable liquids or
materials in the same room with the boiler.
7.
Verify an external oil fi lter is installed between
the oil tank and the boiler.
8.
Check all fuel lines connections for leaks.
Checkout and Startup Procedure
1.
Disconnect burner electrical harness.
2.
Attach oil presssure gauges to oil pump pres-
sure ports.
3.
Verify burner is properly installed to boiler
door.
4.
Verify oil line (gravity fed).
5.
Verify oil pump. Bleed oil line and verify pump
connector.
6.
Verify nozzle selection.
7.
Verify electrode setting.
8.
Verify turbo setting.
9.
Verify airgate setting.
10.
Reconnect burner electrical harness.
11.
Turn the electrical power to the boiler On.
12.
Set the room thermostat to continuous heating
operation as required.
13.
Turn the boiler service switch to On. This is
located on the boiler control panel.
14.
Turn the boiler supply water thermostat knob
to the desired setting. The boiler will begin to
function automatically.
15.
As the boiler is energized, set up and verify
operation of the boiler.
If the burner does not fi re, refer to the Troublshooting
section of the Service Facts, shipped with the boiler.
16.
Verify pump pressure and adjust as needed.
17.
Check CO2 level.
18.
Check smoke.
19.
Make minor adjustment to CO2 and turbulator
settings as needed.
20.
Recheck CO2 and smoke. Repeat process as
needed. Upon completion, de-energize boiler
and disconnect power.
21.
Disconnect oil pressure gauge and secure oil
pressure port.
22.
Install burner cover.
23.
Re-energize boiler.
24.
Recheck CO2 and smoke levels.
25.
Perform additional adjustments as needed.