Toshiba MD19N1 Service Manual page 17

Hide thumbs Also See for MD19N1:
Table of Contents

Advertisement

The Lever should be position
between A and B.
Rack Loading
2-5:
TRAVERSE HOLDER/INSULATOR (F)
(Refer to Fig. 2-5-A)
1.
Remove the Traverse Holder.
2.
Remove the 2 Insulator (F).
Main Chassis Ass'y
Insulator (F)
(Black)
Traverse Holder
NOTE
1. After the installing of the Traverse Holder, check if the
wire is like Fig. 2-5-B.
Main Chassis Ass'y
DISASSEMBLY INSTRUCTIONS
A
B
Fig. 2-4-C
Lever Switch
Fig. 2-4-D
Insulator (F)
(Black)
Fig. 2-5-A
Traverse Holder
Fig. 2-5-B
2-6: SWITCH PCB ASS'Y (Refer to Fig. 2-6-A)
Remove the screw 1.
1.
2.
Remove the Switch PCB Ass'y.
Switch PCB Ass'y
Main Chassis Ass'y
• Screw Torque: 4 ± 0.5kgf•cm
NOTE
1. When installing the wire of the Switch PCB, install it
correctly as Fig. 2-6-B.
Switch PCB Ass'y
2-7: RACK FEED ASS'Y (Refer to Fig. 2-7-A)
Remove the screw 1.
1.
2.
Remove the Rack Feed 1/2 Spring, Rack Feed 1/2 and
Rack Feed Lever.
Rack Feed 1 Spring
Rack Feed 2 Spring
Rack Feed Lever
Rack Feed 1
Main Chassis Ass'y
• Screw Torque: 3.5 ± 0.5kgf•cm
NOTE
1.
After the assembly of the Rack Feed, check if the Rack
Feed 1/2 is moving smoothly. (Refer to Fig. 2-7-B)
2.
In case of the Rack Feed Ass'y installation, install
correctly as Fig. 2-7-C.
B2-2
1
Fig. 2-6-A
Black
From Relay PCB
White
Fig. 2-6-B
1
Rack Feed 2
Fig. 2-7-A

Advertisement

Table of Contents
loading

Table of Contents