Beko BEKOMAT 33iU Original Installation And Operation Manual page 38

Table of Contents

Advertisement

BEKOMAT
®
33iU / 33iU CO
Illustration
H
X5
6
H
6
X5
2
38 | 68
Connection work - series connection
G
X6
6
Connection cable [X6]
Connection cable [X5]
G
6
X6
1
Original installation and operation manual
Description / explanation
6. Fit the counter nuts [6] over the connection cable [X5]
and insert connection cable [X6].
7. Insert the connection cable [X5] into the left cable
gland [H].
8. Insert the connection cable [X6] into the right cable
gland [G].
9. Connect connection cable [X5] and connection
cable [X6] according to the terminal diagram "4.7
Terminal diagram" on page 26.
10. Draw cable [X5] and connection cable [X6] taut.
11. Screw the counter nuts [6] onto the left cable
gland [H] and right cable gland [G].
12. Set the top cover [2] in place and insert the screws [1].
13. Tighten the screws [1] with a torque of
0.9 Nm +0.5 Nm (0.66 ft-lb +0.37 ft-lb).

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bekomat 33iu coBm33iuBm33iu co

Table of Contents