Starting up and operation
Ê Follow the on-screen instructions (see also section
server and installing the operating system with the ServerView
Installation Manager" on page 82
installing the operating system without the ServerView Installation
Manager" on page
– System already installed:
Ê Press the On/Off button.
The server is switched on, performs a system test and boots the
operating system.
I
In the case of configurations with a large memory size, the boot
process may be prolonged and the screen may remain dark for
several minutes.
Switching the server off
The power-on indicator lights up green.
Ê Shut down the operating system properly.
The server is switched off automatically. The AC connected indicator lights up
green.
I
If the operating system does not switch off the server automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal for power button override.
V
CAUTION!
There is a risk that data may be lost.
Other On/Off options
Besides the On/Off button, the server can be switched ON and OFF in the
following ways:
– Timer-controlled switch-on/off
Using the ServerView Operations Manager or iRMC S5, you can configure
that the server is switched on/off controlled by an internal timer.
– Ring indicator
The server is switched on by an internal or external modem.
78
or section
83).
Operating Manual
"Configuring the
"Configuring the server and
RX2520 M4