Mitsubishi Electric PUZ-ZM60VHA2 Service Manual page 102

Split-type, heat pump air conditioners
Hide thumbs Also See for PUZ-ZM60VHA2:
Table of Contents

Advertisement

OPERATING PROCEDURE
12. Removing the compressor (MC)
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove 2 front cover panel fixing screws (5 × 12) and
remove the front cover panel. (See Photo 1)
(4) Remove 2 back cover panel fixing screws (5 × 12) and
remove the back cover panel.
(5) Remove the electrical parts box. (See Photo 4)
(6) Remove 3 valve bed fixing screws (4 × 10) and 4 ball valve
and stop valve fixing screws (5 × 16) and then remove the
valve bed.
(7) Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit then remove the right side panel.
(8) Remove 2 separator fixing screws (4 × 10) and remove
the separator.
(9) Recover refrigerant.
(10) Remove the 3 points of the compressor fixing nut using
a spanner or an adjustable wrench.
(11) Remove the welded pipe of compressor inlet and outlet
then remove the compressor.
Note: Recover refrigerant without spreading it in the air.
13. Removing the power receiver
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove 2 front cover panel fixing screws (5 × 12) and
remove the front cover panel. (See Photo 1)
(4) Remove 2 back cover panel fixing screws (5 × 12) and
remove the back cover panel.
(5) Remove the electrical parts box. (See Photo 4)
(6) Remove 3 valve bed fixing screws (4 × 10) and 4 ball valve
and stop valve fixing screws (5 × 16) then remove the valve
bed.
(7) Remove 3 right side panel fixing screws (5 × 12) in the
rear of the unit then remove the right side panel.
(8) Recover refrigerant.
(9) Remove 4 welded pipes of power receiver.
(10) Remove 2 receiver leg fixing screws (4 × 10).
Note: Recover refrigerant without spreading it in the air.
OCH771
PHOTOS/FIGURES
Photo 12
Stop valve
Valve bed
Valve bed
fixing screw
Separator
Compressor
Separator fixing screw
Photo 13
Receiver leg
fixing screws
102
Ball valve
Valve bed
fixing screws
Power
receiver
Compressor fixing nut
4 welded pipes
Power
receiver
Receiver
leg

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents