Valve cap tightening torque
Valve cap
Ø6.4 mm (1/4")
Ø15.9 mm (5/8")
Service port cap tightening torque
10.8~14.7 N•m (110~150 kgf•cm)

Refrigerant piping work

Pipe handling guidelines
Protect the open end of the pipe against dust and moisture.
All pipe bends should be as gentle as possible. Use a pipe
bender for bending.
Bending radius should be 30 to 40 mm or larger.
Selection of copper and heat insulation materials
When using commercial copper pipes and fittings, observe the
following:
Insulation material: polyethylene foam
Heat transfer rate: 0.041 to 0.052 kW/mK (0.035 to 0.045 kcal/
mh°C)
Refrigerant gas pipe's surface temperature reaches 110°C max.
Choose heat insulation materials that will withstand this
temperature.
Be sure to insulate both the gas and liquid piping and to provide
insulation dimensions as below.
Pipe size
Outer
diameter
Thickness
6.4 mm (1/4")
0.8 mm
15.9 mm (5/8")
1.0 mm
1
Gas pipe
2
Inter-unit wiring
3
Liquid pipe
4
Liquid pipe insulation
5
Finishing tape
6
Gas pipe insulation
Use separate thermal insulation pipes for gas and liquid
refrigerant pipes.
Installation manual
5
Gas pipe
21.6~27.4 N•m
(220~280 kgf•cm)
44.1~53.9 N•m
(450~550 kgf•cm)
Pipe insulation
Inner diameter
Thickness
≥10 mm
8-10 mm
≥13 mm
16-20 mm
2
1
3
6
4
5

Purging air and checking gas leakage

When all piping work is completed and the outdoor unit is connected
to the indoor unit, it is necessary to purge the air and check for gas
leakage.
WARNING
Do not mix any substance other than the specified
refrigerant (R410A) into the refrigeration cycle.
When refrigerant gas leaks occur, ventilate the room
as soon and as much as possible.
R410A, as well as other refrigerants, should always
be recovered and never be released directly into the
environment.
CAUTION
Use a vacuum pump for R410A exclusively. Using the
same vacuum pump for different refrigerants may damage
the vacuum pump or the unit.
If using additional refrigerant, perform air purging from the
refrigerant pipes and indoor unit using a vacuum pump, then
charge additional refrigerant.
Use a hexagonal wrench (4 mm) to operate the stop valve rod.
All refrigerant pipe joints should be tightened with a torque
wrench at the specified tightening torque. See
refrigerant piping to the outdoor unit" on page 4
1
Pressure meter
2
Gauge manifold
3
Low-pressure valve (Lo)
4
High-pressure valve (Hi)
5
Charging hoses
6
Vacuum pump
7
Service port
8
Valve lids
9
Gas stop valve
10
Liquid stop valve
1
Connect the projection side (on which the worm pin is pressed)
of the charging hose coming from the gauge manifold to the gas
stop valve's service port.
2
Fully open the gauge manifold's low-pressure valve (Lo) and
completely close its high-pressure valve (Hi).
The high-pressure valve subsequently requires no operation.
3
Apply vacuum pumping. Check that the compound pressure
gauge reads –0.1 MPa (–760 mm Hg).
Run time
4
Close the gauge manifold's low-pressure valve (Lo) and stop the
vacuum pump.
Leave as is for 4-5 minutes and make sure that the coupling
meter needle does not go back.
NOTE
If the meter needle does go back, this may
indicate presence of moisture or leaking from
connecting parts. Repeat steps 2 through 4 after
checking
all
loosening and retightening the nuts.
5
Remove the covers from the liquid stop valve and gas stop
valve.
"Connecting the
for details.
1
4
8
2
3
5
6
7 8 9
Pipe length
≤15 m
>15 m
≥10 minutes
≥15 minutes
connecting
parts
and
slightly
ERYQ005~007ABV3
Outdoor unit for air to water heat pump
3P177782-1B
10

Advertisement

Table of Contents
loading

This manual is also suitable for:

Altherma eryq006abv3Altherma eryq007abv3

Table of Contents