Gas Valve Calibration; Gas Conversion - Baxi LUNA DUO-TEC MP 1.90 Instructions Manual For Users And Installers

Condensing gas wall-hung boilers
Table of Contents

Advertisement

Available languages

Available languages

P42
5715
P43
5730
P44
5890
Not used (Do NOT change this parameter)
P45
5931
*BX2 sensor input
P46
5932
*BX3 sensor input
P47
5977
*Input H5
P48
*
P49
P50
Input H2 module 1 (multifunction input)
P51
P52
Building time constant (depending on the insulations of the building)
P53
Software version
P54
LPB device address (BUS connection)
P55
LPB segment address (BUS connection)
P56
Clock time source
P57
Time after maintenance
P58
P59
9512
Required ignition speed
P60
Required minimum operating speed
P61
9529
Required maximum operating speed
P62
P63
P64
Software version
*
xx
(a):

15. GAS VALVE CALIBRATION

To calibrate the gas valve, enable the calibration function as described in section 12.2 and
carry out the following operations:
Check that the
capacity, matches that indicated in table 2 (allowed tolerance +/- 0.5%). If it does not, turn the
adjustment screw (V) on the gas valve. Turn the screw clockwise to decrease the level of
and anti-clockwise to increase it (allowed tolerance +/- 0.2%).
Check that the
capacity, matches that indicated in table 2 (allowed tolerance +/- 0.5%). If it does not, remove
the threaded brass cap on the gas valve and turn the adjustment screw (K). Turn the screw
clockwise to increase the level of
+/- 0.2%).
V
PI
Pressure signal sealed chamber

15.1 GAS CONVERSION

7115213.01 (4-10/14)
xxx
(b): parameters read on the Remote Control
and anticlockwise to decrease it (allowed tolerance
K
OFFSET adjustment screw
Pi
Gas supply pressure tap
36
-
0
0
1
1
-
33
0
-
0
0
-
0
0
-
18
0
-
0
0
-
0
0
-
0
0
-
2
1
h
15
0
-
---
0
-
1
-
0
-
0
month
xxx
0
-
1
0
rpm
xxx
0
rpm
xxx
0
rpm
xxx
0
-
1
1
-
1
0
-
xx
0
1
3
43
19
19
32
7
1
58
2
50
99
16
14
3
240
1
8000
8000
8000
2
1
999

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna duo-tec mp 1.110

Table of Contents