Arm Maintenance Standards - New Holland E70SR Workshop Manual

Table of Contents

Advertisement

3. ATTACHMENT DIMENSIONS
3.2.2

ARM MAINTENANCE STANDARDS

(1) Clearance of pin and bushing
Pos.
Item
A
Arm point
Bucket link
B
(Bucket side)
Idler link
C
(Arm connection)
Bucket link
D
(Idler link)
Bucket cylinder
D'
(Rod side)
Bucket cylinder
E
(Bottom side)
Arm cylinder
G
(Rod side)
Connecting part of
F
arm and boom
Fig. 3-4 Clearance of pin and bushing on arm section
Standard value
Pin dia.
Pin dia.
tolerance
-0.06
(-0.0024)
-0.09
(-0.0035)
Ø50
(1.9685)
-0.06
(-0.0024)
-0.12
(-0.0047)
-0.06
(-0.0024)
-0.09
(-0.0035)
-0.06
(-0.0024)
-0.09
Ø60
(-0.0035)
(2.3622)
-0.06
(-0.0024)
-0.09
(-0.0035)
Bushing i.d.
Standard value
tolerance
+0.12
+0.11
(+0.0047)
(+0.0043)
+0.05
+0.21
(+0.0020)
(+0.0083)
+0.11
(+0.043)
+0.21
+0.12
(+0.0083)
(+0.0047)
+0.05
+0.11
(+0.0020)
(+0.0043)
+0.24
(0.0094)
+0.25
+0.11
(+0.0098)
(+0.0043)
+0.05
+0.37
(+0.0020)
(+0.0146)
+0.20
+0.06
(+0.0079)
(+0.0024)
+0.00
+0.29
(+0.0000)
(+0.0114)
+0.25
+0.11
(+0.0098)
(+0.0043)
+0.05
+0.34
(+0.0020)
(+0.0134)
+0.20
+0.14
(+0.0079)
(+0.0055)
+0.08
+0.29
(+0.0032)
(+0.0114)
3-8
Unit : mm (in)
Clearance
Limit
Standard
Remedy
value for
limit
repair
value
Replace
2.0
2.5
bushing
(0.08)
(0.1)
or pin

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents