Minimum Clearances - Viessmann Vitocal 300-G Pro Installation And Service Instructions For Contractors

Heat pump, single and two-stage
Table of Contents

Advertisement

Transport and siting requirements

Minimum clearances

1 heat pump
600
Fig. 3
Heat pump cascade (2 to 5 heat pumps)
600
600
Fig. 4
(cont.)
600
600
Cable entries:
A
On-site strain relief fittings required (wall clearance
≥ 80 mm)
When using hydraulic connection accessories
B
(connection set and Victaulic flange adaptor set,
2
or 3
):
½"
"
1000 mm
On-site hydraulic connections:
600 mm
Clearances for installation and maintenance:
C
≥ 500 mm
Without anti-vibration parts (side sections):
D
≥ 855 mm
Preparing for installation
13

Advertisement

Table of Contents
loading

Table of Contents