ABB 6136/30M-500 Operating Instructions Manual page 93

Table of Contents

Advertisement

Available languages

Available languages

3. Highlight the project in the project list
and press the "OK" button
4. The project is transferred from the
SD/MMC card into the room/control
panel and starts automatically.
5. The units exits the programming mode
automatically and the basic view is
displayed.
Programmi
1. Create the new project on a PC.
ng using
2. Connect the computer with the bus via
the bus
an RS 232 or a USB interface.
3: Press the "EIB Programming Mode"
button and enable it.
4. Start programming from the PC.
This process may take several hours.
ENG
Fig. 69
Fig. 70
45

Advertisement

Chapters

Table of Contents
loading

This manual is also suitable for:

6136/100m-5006136/100c-500

Table of Contents