Final Check List - Scotsman NM1850RH Manual

Table of Contents

Advertisement

NM1850RH
FOR THE INSTALLER: Final Check List
1. Is the unit installed where the air and water
temperatures are within and will remain within
the limitations for the unit?
2. Is there 6" clearance at the rear of the
machine for utility connections?
3. Has the water supply line be checked for
pressures between 20 and 120?
4. Has the unit been leveled?
5. Has the shipping material been removed
from inside the cabinet?
6. Have the electrical connections been made?
7. Have the drains been installed and checked
for leaks?
8. Has the refrigeration supply been installed
and checked for leaks?
9. Has the bin and cabinet been wiped clean
or sanitized?
10. Has the warranty registration card been
properly filled out and mailed to Scotsman?
11. Has the owner been given the service
manual and been instructed on how to
maintain the icemaker?
13. Has the owner been given the name and
telephone number of the local Scotsman
service agency?
May, 1989
Page 6

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nm1850rh-32a

Table of Contents