Vent Pipe Installation Condition - Energy GH 0618 Installation, Operation, Service And Maintenance Instructions

Table of Contents

Advertisement

8
Instructions Gas Heater GH0618
NOTICE!
The system is equipped with a thermostat to control the environmental temperature
which is attached with the heater equipments.
To operate and control the heater, please connect the thermostat to the heater by
means of a cable prepared at the back of the heater
9- The thermostat should be located at the height of 1.5m of the floor in a place which is not open to the sunshine or cold weather.
Vent pipe installation conditions
The fantasy cement and metal caps on the roof with small side holes, are producing accidents and type H or standard round terminal should be used.
Never use aluminum pipe (flexible) for the heater and other gas burner systems; because, these kinds of pipes will be exited simply.
End of vent pipe should be equipped with the terminal and it should be at least 60 cm higher than the highest part of the building.
Before installation of the heater, please analyze the construction vent pipes from the viewpoint of open path, sealing, no seam and similar length in total path.

Advertisement

Table of Contents
loading

Table of Contents