Download Print this page
Broan VBATHW Installation And User Manual

Broan VBATHW Installation And User Manual

20-40-60 control

Advertisement

Available languages

Available languages

Quick Links

I
NSTALLATION AND
The illustrations in this document are generic; your control appearance may be slightly different from the ones shown.
Electrical wiring must be done by qualifi ed personnel in accordance with all applicable codes and standards.
Before connecting wires, unplug the unit or switch power off at service panel and lock service disconnecting means
to prevent power from being switched on accidentally. Always wear safety glasses and gloves while performing
these instructions.
INSTALLATION
Unplug the ventilation unit.
NOTE: If the control is to be installed in an electric box, go to step
Cut a 2
7
/
" x 1¾" hole in a wall, at a
8
convenient location for the control.
Route a cable (type 22/4) for the
control from the unit to this hole. See
figure at right.
Temporarily place the control over the
hole and mark both mounting screw
hole positions.

Remove the control, drill both screw
holes (3/16" Ø) in wall and insert the wall
anchors (included).

Strip the end of the cable to access the 4 wires (about 3"). Strip the
end of each wire (about 1/4"). Connect the wires to the terminals,
regardless of the wire color. Note which wire color has been
chosen for each terminal. See illustration below.
VC0233

Mount the control to the wall.
U
G
20-40-60 C
SER
UIDE FOR
READ AND SAVE THESE INSTRUCTIONS
WARNING
!
.
Ø 3/16", typ.
VC0210A
12V
LED
OVR
Gnd
VC0211
(
ONTROL
PART NO

Depending on the type of fresh air system installed,
perform
the
electrical
connector of the unit as per one of the four models illustrated
hereafter. For more details, refer to the installation manual of
the ventilation unit.
NOTE: To avoid miswiring, refer to the notes taken at step
to match the wire color with the right terminal.
Remote 6 & 7 positions terminals
VC0234
Remote 10 positions terminal
VC0238
Remote 4 & 6 positions terminals
VC0237
On-board terminal
VC0239
Plug the ventilation unit and test the wall control.
HOW TO USE THE CONTROL
The main button works following this
sequence:
• Click 1 = 20 min
• Click 2 = 40 min
• Click 3 = 60 min
• Click 4 = OFF
• and so on
The indicator lights up as per the selected
duration and the system exchanges air at
MAX speed.
VC0190
.
)
VBATHW
connection
to
the
terminal
12V
LED
OVR
Gnd
23848 rev. 01

Advertisement

loading

Summary of Contents for Broan VBATHW

  • Page 1 NSTALLATION AND UIDE FOR ONTROL PART NO VBATHW READ AND SAVE THESE INSTRUCTIONS The illustrations in this document are generic; your control appearance may be slightly different from the ones shown. WARNING Electrical wiring must be done by qualifi ed personnel in accordance with all applicable codes and standards.
  • Page 2 20-40-60 ( ANUAL DEL USUARIO Y DEL INSTALADOR PARA EL CONTROL DE PIEZA VBATHW LEA Y GUARDE ESTAS INSTRUCCIONES Las ilustraciones en este documento son generales; su control puede tener un aspecto ligeramente diferente. ADVERTENCIA El cableado eléctrico debe ser realizado por personal cualifi cado, de acuerdo con todos los códigos y normas aplicables.