Adjustment Flow Chart After Cylinder Unit Replacement - Panasonic AJ-D440 Service Manual

Dvcpro mechanism
Table of Contents

Advertisement

Figure 1-3
1-4. Adjustment Flow Chart after
Cylinder Unit Replacement
1.
After change the Cylinder Unit, please perform
the following flow chart.
START Mechanical Adjustment (Section 2)
3-8. Tension Confirmation
3-11. Envelope Waveform Adjustment
3-12. Post Limit Confirmation (PLAY)
3-16. A/C Head Tilt Confirmation
3-17. A/C Head Height Confirmation
3-18. A/C Head Azimuth & X-value Adjustment
3-19. REV Tape pass confirmation & Adjustment
3-21. CTL Self-Recording Level Confirmation
3-22.Play Tape Pass Limit Confirmation
3-23. Envelope Waveform Confirmation
(REV/REW/FF)
3-24. Envelope Rising Confirmation
3-25. & 3-26. Tape Pass Limit Confirmation
(REV/REW/FF)
3-27. Screw Lock Tight (A/C Head, T3 & T4 Post)
3-28. Tape Damage Confirmation
(Long Play Type)
Note : Envelope level Adjustment
Note : PG Shifter Adjustment
3-29. LISTA Adjustment Procedure
3-30. LISTA Connection and Boot-up
3-32. LISTA Sensitivity Adjustment
3-32. LISTA Sensitivity Detection
3-33. Linearity Adjustment &
Waving Measurement
3-34. Self-REC/PLAY ENV Confirmation
START Electrical Adjustment
EQ Adjustment
REC CURR & REC FREQ Adj.
NOTE:
Envelope level and PG Shifter adjustment procedure
are mentioned on Electrical Adjustment Procedure on
Service Manual.
3-4
END