Prepare The Site - Kohler Fountainhead K-1786 Installation Manual

Shower receptors
Table of Contents

Advertisement

Available languages

Available languages

Before You Begin (cont.)
If the unit will be adjacent to vertical ducts or wiring, surround the unit with fire-rated,
water-resistant wall material. When fire-rated wall material is specified, stud-opening dimensions
are toward the exposed side of the wall material.
Place the receptor within the installation area prior to completion of the framing.
The basin area requires no additional support when the subfloor is level and square with respect to
the framing. Consider using shims for additional support if the subfloor is uneven.
Consult all applicable instructions for options and accessories before beginning this installation.
Fixture conforms to ANSI Standard Z124.1.2. All dimensions are nominal. All models meet IAPMO
requirements.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.

1. Prepare the Site

Ensure that the installation area is clean and free of all debris. If remodeling, remove all finished
wall material to expose the framing and remove all floor coverings to expose the subfloor.
Inspect the flooring at the installation site. Repair as necessary.
Make sure the subfloor and finished floors are flat and level.
Kohler Co.
3
1065122-2-A

Advertisement

Table of Contents
loading

Table of Contents