Tank Heater - Bunn VPR VPS Operating & Service Manual

Bunn grind and brew coffeemaker operating & service manual vpr, vps
Table of Contents

Advertisement

SERVICE (cont.)

TANK HEATER

FIG. 9 TANK HEATER
Location:
The tank heater is located inside the tank
and secured to the tank lid.
Test Procedures:
1.
Disconnect the brewer from the power supply.
2.
Check the voltage across the black and white
wires on 120 volt models or the black and red
wires for 220 volt models with a voltmeter. Plug-
in the brewer to the power source. The indication
must be:
a) 120 volts ac for two wire 120 volt models.
b) 220 volts ac for two wire 220 volt models.
3.
Disconnect the brewer from the power source.
If voltage is present as described, proceed to #4
If voltage is not present as described, refer to the
Wiring Diagrams and check wiring harness.
4.
Disconnect the black wire and the white wire or
red wire from the tank heater terminals.
5.
Check for continuity across the tank heater ter-
minals.
If continuity is present as described, reconnect the
wires, the tank heater is operating properly.
If continuity is not present as described, replace the
tank heater.
NOTE- If the tank heater remains unable to heat,
remove and inspect heater for cracks in the sheath.
Removal and Replacement:
1.
Remove the tank inlet fitting securing the fill
basin to the tank lid, remove fill basin and tank
inlet gasket. Set all three parts aside for reassem-
bly.
2.
Disconnect the black wire on the terminal block
from the tank heater and disconnect the blue/
black wire from the limit thermostat or thermal
cut-off to the control thermostat.
3.
Disconnect the black wire and the white or red
wire from the tank heater terminals.
P2414
4.
Remove sprayhead and the hex nut securing the
sprayhead tube to the hood. Set aside for reas-
sembly.
5.
Remove the eight #8-32 nuts securing the tank
lid to the tank.
6.
Remove the tank lid with limit thermostat or
thermal cut-off, sprayhead tube and tank heater.
7
Remove the two hex nuts securing the tank
heater to the tank lid. Remove tank heater with
gaskets and discard.
8.
Install new tank heater with gaskets on the tank
lid and secure with two hex nuts.
9.
Install tank lid with limit thermostat or thermal
cut-off, sprayhead tube and tank heater using
eight #8-32 hex nuts.
10. Secure sprayhead tube to hood using a hex nut.
11. Install sprayhead.
12. Reconnect the wires to the limit thermostat or
thermal cut-off, tank heater and control thermo-
stat. See limit thermostat, thermal cut-off and
control thermostat sections in this manual when
reconnecting wires.
13. Install fill basin, secure with tank inlet fitting and
gasket.
14. Refer to Fig. 10 when reconnecting the tank
heater wires.
Page 12
10053 073001

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

VprVps

Table of Contents