Mounting - Metra Electronics ADS-200 Operating Manual

Grain cleaner
Table of Contents

Advertisement

See Annex 1 during mounting.
8.1. Recommendations for the Metra Separator mounting:
When mounting the Metra Separator, the fitter needs to have at least 1200 mm (4 ft) of free space from all sides to provide
ease of maintenance.
8.2. The Metra Separator mounting procedure before operation:
Mount the Metra Separator to the location for further operation.
1.
When mounting the Metra Separator with the removed hopper and reflector, mount them in place by twisting the
screws.
2. If the Metra Separator is supplied with a tap for light fractions, then install the outlet and secure it with bolts to the
reflector.
3. Install feed and discharge conveyor so as to provide a continuous separation process (if necessary, the conveyors will
be completed as option).
8.3. Connection to power supply:
The Metra Separator connection to power mains must be performed by a qualified electrician having electrical safety
access.
Connect the ground to the general grounding circuit in the building.
Connect the power cable to the 220V network according to Table 1.
Connections are made by cable with cross-section not less than the cross section shown in Table 2, which meets the
requirements of electrical mounting rules, taking into account losses in the power supply line.
Separator
Name
ADS-200
ADS-400
ADS-200 CDC
ADS-400 CDC

8. MOUNTING

Cable cross-section,
Rated power,
kW / hp
0.55 / 1
0.7 / 1
0.55 / 1
0.7 / 1
mm2
Cable length, m
Copper
3х1 / 3х1.5
3х1 / 3х1.5
3х1 / 3х1.5
3х1 / 3х1.5
8
Cable length, ft
up to 50/75
up to 165/245
up to 50/75
up to 165/245
up to 50/75
up to 165/245
up to 50/75
up to 165/245
Table 2