Selector Switch (Half Batch) - Bunn SRUA Operating & Service Manual

Operating & service manual - srua
Table of Contents

Advertisement

SERVICE (cont.)
SELECTOR SWITCH (HALF BATCH OPTION)
!
W A
DI SC
R N
BE
ON
NE
IN G
RE
FO
RE
CT
PL
RE
FR
AC
MO
OM
EM
VA
PO
EN
T OF
L OF
W ER
AN
SO
AN
Y PA
UR
Y CO
NE
CE
MP
L OR
ON
EN
T!
FIG. 16 SELECTOR SWITCH (HALF BATCH)
Location:
The selector switch is located to the right of the
front access panel above the start switch.
Test Procedures:
1. Disconnect the brewer from the power source.
2. Disconnect the wires from the switch terminals.
3. Check for continuity across the switch terminals
with the switch in the "CLOSED" (lower - half)
position. Continuity must not be present when the
switch is in the "OPEN" (upper - full) position.
If continuity is present as described, the switch is
operating properly.
If continuity is not present as described, replace the
switch.
IN G
R N
CE
W A
UR
SO
L OR
!
W ER
NE
T!
PO
Y PA
EN
OM
AN
ON
ED
FR
L OF
MP
TE
ND
CT
Y CO
UN
AT
NE
VA
AN
EN
ON
RE
MO
T OF
WH
DI SC
RE
EN
OF
F
FO
EM
RN
BE
AC
: TU
RE
PL
NT
ION
TE
AT
P2130.25
Removal and Replacement:
1. Remove the wires from the switch terminals.
2. Compress the clips on the back side of the switch
and gently push them through the opening.
3. Push the new switch into the opening and spread
the clips to hold switch.
4. Refer to Fig. 17 and reconnect the wires.
GRY to Brew Timer
PNK to Brew Timer
FIG.17 SELECTOR SWITCH TERMINALS
Page 22
P2118.60
10067.3 070102

Advertisement

Table of Contents
loading

Table of Contents